Laserfiche WebLink
7. Revisions to Construction Schedule. <br />8. Progress, schedule, during succeeding work period. <br />9. Coordination of schedules. <br />10, Review submittal schedules, expedite as required. <br />11. Maintenance of quality standards. <br />12. Pending changes and substitutions. <br />13. Review proposed changes for.- <br />a. <br />or:a. Effect on Construction Schedule and on completion date. <br />b. Effect on other contracts of the project. <br />14. Other business. <br />15. Construction schedule. <br />16. Critical/long lead items. <br />F. Attend progress meetings and is to study previous meeting minutes and current <br />agenda items, in order to be prepared to discuss pertinent topics such as deliveries <br />of materials and equipment, progress of the work, etc. <br />Provide a current submittal log at each progress meeting in accordance with Section 01300. <br />1.05 SPECIAL SHOP DRAWING REVIEW MEETING <br />A Within twenty one calendar days following the Notice to Proceed (NTP) the <br />Contractor shall schedule a special shop drawing review meeting to facilitate the <br />review of the systems. <br />S. The purpose of this meeting is to expedite the review process so that the Contractor <br />may place orders with his Supplier's as soon as possible. <br />C. At this meeting, the Contractor shall provide the shop drawings for the items and <br />equipment required. The number of shop drawings required shall be as specified in <br />Section 01300. <br />D. The Contractor shall schedule a special shop drawing review meeting every 21 <br />calendar days following the initial meeting until the items and equipment have been <br />approved to a degree acceptable to the Engineer. <br />PART 2 - PRODUCTS (not use <br />PART 3 - EXECUTION (not cLsedl <br />*END OF SECTION* <br />01200-3 <br />D:IDIVISIQN 1101200 Project Meetings doe <br />