My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-210
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 1:38:55 PM
Creation date
10/5/2015 9:13:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2009
Control Number
2009-210
Agenda Item Number
8.K.
Entity Name
Tru-Sure Corporation
Subject
Reuse Water Main Extension Lateral G Canal and 57th Street
Area
Lateral G Canal 57th St. to 53rd St.
Project Number
2830
Bid Number
2009046
Supplemental fields
SmeadsoftID
11149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Revisions to Construction Schedule. <br />8. Progress, schedule, during succeeding work period. <br />9. Coordination of schedules. <br />10, Review submittal schedules, expedite as required. <br />11. Maintenance of quality standards. <br />12. Pending changes and substitutions. <br />13. Review proposed changes for.- <br />a. <br />or:a. Effect on Construction Schedule and on completion date. <br />b. Effect on other contracts of the project. <br />14. Other business. <br />15. Construction schedule. <br />16. Critical/long lead items. <br />F. Attend progress meetings and is to study previous meeting minutes and current <br />agenda items, in order to be prepared to discuss pertinent topics such as deliveries <br />of materials and equipment, progress of the work, etc. <br />Provide a current submittal log at each progress meeting in accordance with Section 01300. <br />1.05 SPECIAL SHOP DRAWING REVIEW MEETING <br />A Within twenty one calendar days following the Notice to Proceed (NTP) the <br />Contractor shall schedule a special shop drawing review meeting to facilitate the <br />review of the systems. <br />S. The purpose of this meeting is to expedite the review process so that the Contractor <br />may place orders with his Supplier's as soon as possible. <br />C. At this meeting, the Contractor shall provide the shop drawings for the items and <br />equipment required. The number of shop drawings required shall be as specified in <br />Section 01300. <br />D. The Contractor shall schedule a special shop drawing review meeting every 21 <br />calendar days following the initial meeting until the items and equipment have been <br />approved to a degree acceptable to the Engineer. <br />PART 2 - PRODUCTS (not use <br />PART 3 - EXECUTION (not cLsedl <br />*END OF SECTION* <br />01200-3 <br />D:IDIVISIQN 1101200 Project Meetings doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.