Laserfiche WebLink
1. Do not conceal any work until required information is recorded. <br />C. Drawings: legibly mark to record actual construction. <br />1. Depths of various elements of`oundation in relation to finish first floor datum. <br />2. All underground piping with elevations and dimensions, changes to piping <br />location, horizontal and vertical locations of underground utilities and <br />appurtenances, referenced to permanent surface improvements, and actual <br />installed pipe material, class, etc. <br />3. Location of internal utilities and appurtenances concealed in the construction, <br />referenced to visible and accessible features of the structure. <br />4. Field changes of dimension and detail. <br />5. Changes made by Field Order or by Change Order. <br />6. Details not on original contract drawings. <br />7. Equipment and piping relocations. <br />8. Major architectural and structural changes including relocation of doors, <br />windows, etc. <br />9. Architectural schedule changes according to Contractor's records and shop <br />drawings. <br />10. Bronze tablet plaque revisions according to actual installation. <br />11. One set of record shop drawings for each process equipment, piping, (including <br />casings) electrical system and instrumentation system. <br />D. Specifications and Addenda; legibly mark each Section to record. <br />1. Manufacturer, trade name, catalog number, and supplier of each product and <br />item of equipment actually installed. <br />2. Changes made by Field Order or by Change Order. <br />E, Shop drawings (after final review and approval). <br />F. Certified site survey, below ground piping survey, and line elevations and stationing at <br />100 foot increments per Section 01050 by a registered land surveyor. <br />1.06 SUBMITTAL <br />A. At contract close-out, deliver record documents listed in paragraph 1.01A to the <br />Engineer for the Owner. The required field engineering submittals certified by a <br />registered land surveyor are listed in Section 01050. <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br />1. Date <br />2. Project title and number <br />3. Contractor's name and address <br />4. Title and number of each record document <br />5. Signature of Contractor or his authorized representative <br />PART 2 - PRODUCTS (not t/so!D <br />PART 3 - EXECUTION (not use, <br />*END OF SECTION* <br />01720-2 <br />n_1.DIVISION 1101720 Record Drawirgs.doc <br />