My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/5/1981
CBCC
>
Meetings
>
1980's
>
1981
>
8/5/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:53:13 AM
Creation date
6/11/2015 1:36:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/05/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� AUG 5 19 1 <br />BOOK 4 7 PAGE 74 <br />-MANGE OWNER ❑ <br />ARCHITECT ❑ <br />ORDER CONTRACTOR o <br />FIELD ❑ <br />A!A DOCUMENT 0701 OTHER <br />PROJECT: Indian River County CHANGE ORDER NUMBER: 62 <br />;name. address) County Administration Bldg. <br />TO (Contractor) <br />r <br />ARCHITECT'S. PROJECT NO: 9363 Reinhold Construction inc. <br />P.O,Box 666 CONTRACT FOR Additions and Renovations <br />Cocoa, FL 32922 <br />L I CONTRACT DATE:4/2/E0 <br />N ou are directed to male the following changes in this Contrac' <br />CP -87 Provide a quotation for: <br />A. Rebuitl Engine <br />B. New Engine <br />For For repair of emergency generator system/ per Reinhold and <br />behe I, Umholz electrical contractors. at request of the owner. <br />Per may 14,1981 letter from Tampa Armature Works <br />The proposed changes In the work m3y result In additional time <br />required beyond the contract completion date. Additional time <br />will be -added to the contract that is directly related to this change <br />order. The contractof will be paid for the additional required days <br />at the rate of$300.00 (three hundred) per day for fixed overhead <br />costs. The number of days requested are not reflected In the attached <br />documents. <br />$11.010.12 <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . $ 2,748,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . S 340,030,61 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . S 3,088,030.61 <br />The Contract Sum will be (increased)by this Change Order . . . S 11 ,010.12 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 3,099,040,73 <br />The Contract Time will be (increased) (decreased) (unchanged) by (_ _ _) Dais <br />The Date of Completion as of the date of this Change Order therefore is <br />CONNELL METCALF s EDDY �RpEIINHOLD CONSTRUCTION INC. <br />lNOTEio, Dixie Highway P.J0. IR ox %60 <br />Address Address <br />Coral Gables, FL 33134 Cocoa, Fl 32922 <br />P C:x ft." 717 8 Y <br />DATE —7 DATE <br />INDIAN RIVER COUNTY <br />"z'019 14th Ave <br />Address <br />Ver Beach, FL 32960 <br />1 <br />DATE <br />AIA DOCUMENT C791 • CHANGE ORDER • APRIL 1970 EDITION • AIAC • 0 1970 • THE 0%1 PAGE <br />ANtRICAN i%5TI7UT[ OF ARCHITECTS, 1715 NEW YORK AVE., NW, WASHINGiON, D.C. 2OW6 <br />60 <br />� � r <br />
The URL can be used to link to this page
Your browser does not support the video tag.