My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:44:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B-4: Change Proposal No. 117,(8-26-81) 2nd floor of 3 story bldg., southwest <br />end, "future unassigned space" requested by Sheriff Tim Dobeck's Organized <br />Crime Bureau, Capt. Jim Atkinson, via letters to Neil Nelson & Herkon. <br />Work: Build new partitions, provide more electircal & telephone outlets, <br />and extend one supply duct, provide R/A grilles. <br />Status: Being priced out by Gen. Contractor & Subs. <br />Costs: Will be moderately substantial by my opinion. <br />B-5: Change Proposal No. 118 (9-8-81) 3rd floor, "future room S-338, of 3 <br />story bldg. 47 ft. X 52 ft. (2,444 Sq. ft.). <br />State Marine Patrol interested in renting 3/4 of this space; the remaining <br />1/4 space for County. <br />Work: Completing air conditioning to west 2/3rds of room. Room contains <br />(1) one thermostat for (4) four air handler units. Add - 3 more thermostats <br />also. <br />NOTE: This room will not be usable insofar as being divided into smaller <br />rooms if this not done. <br />Status: Being priced out by G.C. cost will be moderately substantial. <br />B-6: Change Proposal No. 115 (9-1-81) is a "credit to Owner" of 3 items: <br />Item #1. Credit for reusing an existing door to replace an existing <br />lined door to Tax Collector's area. <br />(Change Order #43, C.P. #84 cost was $973.23) <br />Item #2: Credit for isntalling M -R drywall ceiling in storage room S-174 <br />-- located in Utilities Dept. <br />(Change Order X41, C.P. #83 - cost was $332.09) Note: This was in original <br />contract. <br />Item #3: Credit for (3) new brick man holes and approx. 200 lin. ft. of <br />-- -`. - 12" round sanitary sewer lines, running north to 26th St. <br />(Change Proposal #28 - Note: G.C. submitted a cost of $21,000 which was <br />rejected by Herkon & Architects as being too low, and imcomplete. G.C. <br />- has not resubmitted to Architect.) <br />Note: The above M.H. & Sewer lines did not have to be installed. <br />Status of B-6: C.P. 115 is in hands of Gen. Contr. and after review <br />- of credits submitted to Herkon & Architect a Change Order a Change Order <br />will be forthcoming. <br />B-7: Change Order #24 (3-5-81) was replaced by Change Order #28, Change <br />Proposal #58 has not been issued. <br />Status: We have a hold on this as we are waiting for the Gen. Contr. <br />to submit his time and material cost to Architect in lieu of <br />$800.00 stated on C.O. #28. <br />Work: Repair east side only of 3 story building, of loose stucco <br />(dangerous to pedestrains walking below) various areas. C.O. 28 <br />stipulated 50 sq. ft. max. of areas to be replaced. <br />This Change Order will be forthcoming. Costs should be less than $800.00 <br />stated. <br />B-8: Work Order relating to part of Change Proposal No. 74, items 1, 3, 5, <br />& 12 as time & material cost. <br />SEP 1.61991 Booz 47 PACEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.