My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
9/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:19 AM
Creation date
6/11/2015 1:44:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSP 16 1981 BO0� � PAGE 5p39 � <br />Status: This method of reimbursement to the Gen. Contr. has been <br />recommended by the Architect and owners rep. in that we have <br />been unable, after some 2 months plus of review, to arrive at <br />what we believe is a reasonable cost. This has been determined <br />as being extra work not covered by the plans & specs. After <br />completion of said items 1, 3, 5, & 12, A Change Order will be <br />forthcoming. Cost should be approx. $20,000 to $24,000 in my <br />opinion. Does not include extra days cost of extended time to <br />contract. <br />Work: <br />Item 1: H.W. piping extension to AHU- #5. <br />Item 3: Piping to (3) new fan coil units - CHW-S/R, HW-S/R <br />Item 5: Furnish & install (3) HW coils, 2nd fl. exist. AHU's, M.E. room <br />Item 12: Reroute new condenser water piping. <br />Note: Herkon is monitoring daily work and signing said reports on <br />above items. <br />B-9: Work Order relating to replacing existing defective valves and repairing <br />& some replacement of existing piping, CHW-S/R, & HW-S/R as time & <br />material cost. <br />Status: This method or reimbursement to the Gen. Contr. has been recommended <br />by the Architect and owners rep., in that we have been unable, after some <br />2 months plus of review, to arrive at what we believe is a reasonable <br />cost. This has been determined as being extra work, not covered by plans <br />and spec's. <br />After completion of said work a Change Order will be forthcoming. <br />Costs should be approx. $46,000 in my opinion. Does not include extra <br />- _- days cost of extended time to contract. <br />Work: (32) valves in chiller boiler room and (6) valves in 2nd floor <br />M.E. room. Valves vary in size from 1 1/2" to 6". Piping is in <br />_- various areas of 1st, 2nd, & 3rd floors. <br />B-10: Work relating to the remaining 13 Items of Change Proposal No. 74 has been <br />-- - - determined by the A/E.as being in the -original contract. <br />The original cost submitted on the whole of C.P. 74 by the G.C. was <br />$94,000 and then revised down to approx. $74,000. With the work <br />orders deducted from the $74,000, I am sure that the G.C. will do the <br />remaining 13 items under protest and try and collect on these thru some <br />other means. <br />B-11: The following items will be in litigation and cost settlement at this <br />time cannot be determined. <br />A. Fire Walls: <br />B. Painting <br />End of Administration Building <br />NOTE: I do not anticipate any more Change Orders, unless some unforseen condition <br />pops up that I do not know about. <br />M M <br />
The URL can be used to link to this page
Your browser does not support the video tag.