My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/4/1981
CBCC
>
Meetings
>
1980's
>
1981
>
11/4/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:20 AM
Creation date
6/11/2015 1:39:29 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/04/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II: Design and Construction <br />Surveillance of: <br />f <br />B. Booster Pumping station at <br />ground storage tank location. <br />C. In-line booster pumping station <br />with bi-directional flow capa- <br />bility. <br />D. 14" waterline from elevated tan'; <br />to Compass Cove Drive. <br />E. 2 1/2" waterline from Spyglass <br />Lane to <br />sEA7_ <br />Ve7 CF}at <br />F. Connection of new improvements <br />to existing South Beach system. <br />A. 20" subaqueous waterline cross- <br />ing of the Indian River. <br />B. Connection of subaqueous cross- <br />ing to South County Water System. <br />C. 10" waterline from river crossing <br />to elevated tank. <br />D. 14" waterline from Compass Cove <br />Drive to Spyglass Lane. <br />E. 12" waterline from Spyglass Lane <br />to 1,400 feet north of County <br />line. <br />F. 10" waterline from 1,200 feet <br />north of County line to County <br />line. <br />SECTION B - COMPENSATION FOR BASIC ENGINEERING SERVICES <br />The OWNER shall compensate the ENGINEER for Basic Engineering Services for each <br />Phase of the work covered by this j%o dification Number 6 in accordance with the <br />Payment Schedule listed below. <br />Payment Schedule <br />1. Phase I Improvements: <br />Payment to the ENGINEER shall be the total payroll cost of salaries <br />and wages for personnel assigned to the Project, times a factor of 2.1 to provide <br />for general overhead and profit, plus the actual cost of reimbursable expenses <br />as defined hereinafter. Such compensation to the ENGINEER shall not exceed <br />$67,000.00 without OWNER'S written authorization. <br />Page Five <br />Bea 48 PAGE 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.