Laserfiche WebLink
MAR 1'7 1992 <br />UNITED STATES DEPARTMENT OF AGRICULTURE FORM APPROVED OMB No. 40-R5007 <br />Form FmIiA 4'_4-7 FARMERS HOME ADMINISTRATION ORDER NO. <br />(Rev. 6-11-80) 1 <br />CONTRACT CHANGE ORDER <br />South County Water System, !dater System Improvements <br />Contract Part I - Distribution System <br />CONTRACT FOR <br />Indian River County, Florida <br />OWNER <br />r DATE <br />I 02/11/82 <br />STATE <br />Florida <br />COUNTY <br />Indian River County <br />Scarborough Constructors, Inc. <br />To (Contractor) <br />You are hereby requested to comply with the following changes from the contract plans and specifications: <br />Description of Changes DECREASE INCREASE <br />(Supplemental Plans and Specifications Attached) in Contract Price in Contract Price <br />1. South Beach water line connection to South �$ <br />County Water System <br />2. Relocation of 6" meter and meter vault frorr <br />12th St. to Old Dixie <br />3. -Dewatering south side of -Oslo Road on the <br />east side of U.S. 1 to provide for connec- <br />tion to River Shores <br />JUSTIFICATION: <br />$ <br />5,600.00 <br />6,500.00 <br />1,500.00 <br />......... _.._---------------- <br />13 600.00 <br />TOTALS S -------•----•--------•--....___.. r-_. _....:..._.. - .-----•--..__. <br />SEE ATTACHMENTS "A", "B" AND "C" <br />amount of the Contract will be)WWU&-Xa0 (Increased) By The Sum Of: Thirteen thousand six <br />ndred and 00/100------------------------------------- Dollars (S <br />13,600.00 ) <br />Contract Total Including this and previous Change Orders Will Be: Nine hundred fifteen thousand <br />x hundred ninety seven and -35/100 -------------------- Dollars (S 915,697.35 ), <br />e Contract Period Provided for Completion Will BeXFAMXd%)%(dUeU" (Unchanged): -O- Days. <br />is document w 11 become a supplement to the contr a d all provisions will apply hereto. <br />Requested �✓ Q3//7 I -- <br />(Owner) <br />(Oµ•net) (Dete�� <br />Recommended p/ P _ 2 f2j � <br />l (�jwner's Architect/Engineer) (Date) <br />Accepted`(_/�:. <br />(Contractor) (Date) <br />Approved By FmHA <br />7 (Name and Title) (Date) <br />This Information will be used as record of any Number copies required: 4 No further monies or other benefits may be paid out under this <br />Changes to the original construction contract. I program unless this report Is completed and filed as required by <br />Time to complete: 30 min. I existing law and regulations (7 C.F.R. Part 1924). <br />a U.S.GPO:1980-0t)W11811514 P 0 i i t <br />FmHA 424-7 (Rev. 6-11-80) ` <br />T: <br />CZ :S Tl <br />T' - F <br />T1 <br />$ <br />5,600.00 <br />6,500.00 <br />1,500.00 <br />......... _.._---------------- <br />13 600.00 <br />TOTALS S -------•----•--------•--....___.. r-_. _....:..._.. - .-----•--..__. <br />SEE ATTACHMENTS "A", "B" AND "C" <br />amount of the Contract will be)WWU&-Xa0 (Increased) By The Sum Of: Thirteen thousand six <br />ndred and 00/100------------------------------------- Dollars (S <br />13,600.00 ) <br />Contract Total Including this and previous Change Orders Will Be: Nine hundred fifteen thousand <br />x hundred ninety seven and -35/100 -------------------- Dollars (S 915,697.35 ), <br />e Contract Period Provided for Completion Will BeXFAMXd%)%(dUeU" (Unchanged): -O- Days. <br />is document w 11 become a supplement to the contr a d all provisions will apply hereto. <br />Requested �✓ Q3//7 I -- <br />(Owner) <br />(Oµ•net) (Dete�� <br />Recommended p/ P _ 2 f2j � <br />l (�jwner's Architect/Engineer) (Date) <br />Accepted`(_/�:. <br />(Contractor) (Date) <br />Approved By FmHA <br />7 (Name and Title) (Date) <br />This Information will be used as record of any Number copies required: 4 No further monies or other benefits may be paid out under this <br />Changes to the original construction contract. I program unless this report Is completed and filed as required by <br />Time to complete: 30 min. I existing law and regulations (7 C.F.R. Part 1924). <br />a U.S.GPO:1980-0t)W11811514 P 0 i i t <br />FmHA 424-7 (Rev. 6-11-80) ` <br />