My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/17/1982
CBCC
>
Meetings
>
1980's
>
1982
>
3/17/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:38 AM
Creation date
6/11/2015 2:05:42 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/17/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 171982 goa 49 rwu 154 <br />TO: The honorable Members of the DATE: March 8, 1982 FILE: <br />Board of County Commissioners <br />THRU: David L. Greene, <br />Assistant County Administrator <br />yN <br />FROM: James W. Davis, P.E. <br />Rtblic 1%'orks Director <br />SUBJECT: Status Report <br />1) Gifford Street Light Project <br />2) R.D. Carter Road Paving Project <br />3. Traffic Signal Installation - <br />8th Street and 28th Avenue <br />REFERENCES: <br />The status of the above subject projects are as follows: <br />1) Gifford Street Lighting Project: <br />The City of Vero Beach is 90o complete with street light installation <br />as per conversation witR ruzzy Cox, City of Vero Beach Electrical Engineering <br />Manager on March 5, 1982. The City is primarily responsible for the <br />Southern and Eastern portion of the Street Light District. <br />Mr. Herman Firsh, Florida Power and Light Co., via telephone conversation <br />on March 8, 1982 stated that Florida Power & Light has not begun instal- <br />lation yet, however, by March 10, 1982, he should have a fira schedule. <br />It is anticipated that all lights in the City's service area will be <br />installed by March 11; 1982 (approx. 184 lights). <br />There are complaints received that lights are not in a desirable location <br />or not bright enough. To relocate a light would cost about 5300. if a - <br />pole were required.. <br />2) R. D. Carter Rd. <br />A survey was ordered in October 1981 from Surveying Consultants, Paul <br />Ro-sskamp, Registered Land -Surveyor, as approved by the Roard'bf County <br />Commissioners in Sept. 1981. Most of the survey work is complete and <br />the Public Works Department has received a -preliminary drawin . The <br />individual lot lines are being researched. Unfortunately, the surveyor <br />Paul Rosskamp, has had a number of heart attacks and has been in tho <br />hospital for a number of weeks. This has delayed the project. Also, <br />the Indian River Farms Drainage District has informed the Count` that <br />a Bridge is required across the 35th avenue canal where a culvert now <br />exists. This shall require the staff requesting additional funds bevond <br />the $50,000 appropriated for this 1 mile length of road. If the completed <br />survey is not delivered by March 31, 1932, I recommend having another <br />local surveyor complete the survey. The County has not paid for any <br />survey work to date. <br />3) Traffic.Signal Installation - 8th St. and 27th Avenue: <br />The poles for the flashing beacon will be installed Nlonda)• morning, <br />March 8, 1982. The County has received permission from Florida Potter <br />and Light for electrical service. This installation should be complete <br />during the month of March. <br />If you wish additional information on these items, please so indicate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.