My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1982
CBCC
>
Meetings
>
1980's
>
1982
>
7/14/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:11:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
07/14/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At this point in time, it may be advisable for the County to sit down and <br />talk it over with the City of Vero Beach. If our office can be of any <br />further assistance, please call. <br />Very.truly yours, <br />SVE`RDRUP & PARCEL AND ASSOCIATES, Inc. <br />G - <br />Guy J. Wills <br />ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Bird, the Board unanimously <br />approved Change Order #2 to be charged to the <br />construction account. <br />Contract No. Date Apri 1 13, 1982 <br />Change Order No. 2 Location Pebble Bay Sewerage Area <br />To: (Contractor) Bain Underground Utilities, Inc. <br />You are hereby requested to comply with the following changes from the contract drawings & specification', <br />Item <br />Description of Changes — Quantities, Units, Unit Prices, <br />Decrease in <br />Increase in <br />_ No. <br />Change in Completion Schedule, Etc. <br />Contract Price <br />Contract Pric: <br />(1) <br />(2) <br />3 <br />(4) <br />1. <br />Contractor shall add an 8" resilient seat gate valve <br />and box at the location shown on the attached sketch. <br />700.00 <br />� 1� tQirz <br />100 r , <br />gn.1 <br />Change in contract price due to this Change Order: <br />700.00 <br />$ <br />xxxxxxxxxxx <br />Total Decrease <br />xxxxxxxxxxx <br />$ 700.00 _ <br />Total Increase <br />Difference between Col. (3) and (4): <br />$ <br />S 700.00 <br />Net (increase) MUM) M) contract price <br />$ <br />$ 700.00 <br />The sum of $ 700.00 is hereby added to, 7C%M3'4tfdXXi�_d' W the total contract price, an <br />the total adjusted contr2ct price to date thereby is S 115,158.35 <br />The time provided for completion in the contract is unchanged, by -0- <br />calendar days. This document shall become an amendment to the contract and all provisions of th <br />contract will apply hereto. <br />Accepted by: <br />DContractor 0 Date <br />Recommended by://4Fw�l� �/9 �8 <br />Engineer Date <br />Requested by: Date <br />Owncr <br />NOTE: Work performed under this change order prior to Owner's concurrence is at the Contractor <br />risk. 5 <br />J U L 14 1982 BOOK 50 Pay X14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.