My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-24
CBCC
>
Ordinances
>
1980'S
>
1983
>
1983-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 10:46:18 AM
Creation date
10/5/2015 9:46:58 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1983-24
Adopted Date
07/20/1983
Ordinance Type
Subdivision and Platting
State Filed Date
08\09\1983
Entity Name
Unincorporated County
Subject
Platting and Subdivision of Land
Supplemental fields
SmeadsoftID
12952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
either of the following procedures. No construction may commence <br />until the applicant obtains a land development permit, see Section <br />7 (D) 1. <br />(a) Construction before Final Plat Approval. The <br />applicant shall submit construction plans and specifications as <br />required in Section 7 E. (3) of this ordinance together with a <br />request for a land development permit. A certificate of ownership <br />shall accompany the request. The improvements required by this <br />ordinance and the preliminary plat approval shall be completed <br />prior to final plat approval, -or <br />(b) Construction after Final Plat Approval. The <br />applicant shall submit construction plans and specifications as <br />required in Section 7 E. (3) of this ordinance for subdivision <br />improvements and obtain a Land Development Permit. The Land <br />Development Permit shall be submitted with a final plat drawing <br />for approval. Security will be required for the performance and <br />maintenance of all improvements which are to be constructed after <br />final plat approval (See Section 9 A.). <br />3) Plans and Specifications Required for a Land <br />Development Permit. The applicant shall furnish to the Public <br />Works Director the construction plans and -specifications designed <br />in accordance with the approved preliminary plat and the require- <br />ments of this ordinance for the construction of all improvements. <br />The applicant must have obtained and shall submit all utility per- <br />mits and franchises required by the Indian River County Utility <br />Division and ordinances prior to the issuance of a land develop- <br />ment permit. All construction plans and specifications must be <br />prepared, signed and sealed by a professional engineer who is <br />registered in the State of Florida. Engineering calculations and <br />tests in support of any of the proposed plans and specifications <br />may be required. The drawings and required information shall be <br />so complete that review and analysis can be made from them without <br />research of any outside data. Three (3) copies of the plans shall <br />be submitted on twenty-four (24) inch by thirty-six (36) inch <br />sheets unless another size is approved by the County Public Works <br />Director, and shall contain, but shall not be limited to: <br />(a) a cover sheet, including a location map. <br />-26- <br />
The URL can be used to link to this page
Your browser does not support the video tag.