My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-24
CBCC
>
Ordinances
>
1980'S
>
1983
>
1983-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 10:46:18 AM
Creation date
10/5/2015 9:46:58 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1983-24
Adopted Date
07/20/1983
Ordinance Type
Subdivision and Platting
State Filed Date
08\09\1983
Entity Name
Unincorporated County
Subject
Platting and Subdivision of Land
Supplemental fields
SmeadsoftID
12952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
road construction. <br />(7) traffic control devices and pavement markings. <br />(j) the plan and profile of each proposed street <br />and improvements to existing streets such as deceleration or turn <br />lanes (indicating the existing ground surfaces and proposed street <br />grade surface including extensions for a distance of fifty (50) <br />feet beyond the tract boundary) with tentative finished grades <br />indicated, and lot grading plan and including easement work, <br />clearing and grubbing, and structural details of facilities in <br />right-of-way. <br />(k) a typical cross-section of each type proposed <br />street or bikeway, showing the width of pavement, the location and <br />width of sidewalks, where required and rights-of-way. <br />(1) proposed erosion control facilities (seeding <br />and sod limits, etc.) and the limits of earthwork construction. <br />(m) plans for street lighting (having the approval <br />of the local power authority); landscaping, parks, recreational <br />areas and parking area. The plans shall have applicable approvals <br />of all governmental agencies having jurisdiction and which are <br />affected by the construction. <br />(n) projects engineered by.more than one firm shall <br />be coordinated by a single engineering firm or an engineer of <br />record appointed by the developer. <br />(o) a certificate from a surveyor registered in the <br />State of Florida that a concrete permanent reference marker has <br />been located in the public right-of-way at a corner point of the <br />subdivision near the entrance way of the proposed subdivision. <br />The permanent reference marker shall be identified on the plat of <br />the subdivision as the master survey point for the subdivision and <br />shall be used to establish the grade level for all improvements in <br />the subdivision. <br />(p) where the design of the subdivision includes <br />man-made canals or waterways, plans of the proposed construction <br />will be included and shall indicate: <br />(1) all bulkhead lines <br />(2) detailed cross sections showing existing and <br />-28- <br />
The URL can be used to link to this page
Your browser does not support the video tag.