Laserfiche WebLink
AUG 18 1982- <br />51 <br />together with a property owners list for same. The preliminary <br />design shall show in plan view all existing utilities in the <br />right-of-ways and proposed relocation of same. The preliminary <br />plan and cost estimate shall be submitted to the Public Works <br />Director within sixty (60) days of the date of this agreement. <br />(4) After a preliminary plan (as in 3 above) has <br />been reviewed and approved by the County and the County directs <br />the Engineer to proceed, the Engineer will perform the necessary <br />detailed surveys, accomplish a complete detailed design of the <br />project, prepare all necessary local, State, and Federal permit <br />applications for signature by the County and provide all necessary <br />information to acquire all permits, prepare detailed drawings, <br />including plan view, profile view, cross sections at intervals not <br />to exceed fifty (50') feet and at all intersecting roads, drive- <br />ways, and at all other locations at which a special feature <br />warrants, detail drawings of all structures, curbs, etc., prepare <br />complete contract documents, including bid specifications, and <br />make a final cost estimate based on the final design for the <br />entire project, including 20th Avenue and related improvements. <br />Engineer will provide all percolation tests, subsurface explora- <br />tions such as borings, soil tests and the like as may be required <br />to determine dewatering operations, drainage conditions, founda- <br />tion conditions, suitable subgrade conditions, etc.. The Engineer <br />will arrange for all such explorations and tests as apart of <br />basic services without additional charge beyond the lump sum basic <br />fee; however, the actual cost of such explorations and tests shall <br />be treated as a direct cost to Engineer and paid for by the <br />County. <br />(5) The Engineer will attend all conferences with <br />the County and its representatives and other interested parties <br />upon request. <br />(6) Engineer shall provide County with a mainte- <br />nance of traffic plan designed to insure efficient flow of traffic <br />during the construction phase of the project. <br />(7) In.order to accomplish the work described under <br />this agreement under the time frames and conditions set forth in <br />M <br />