My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/18/1982
CBCC
>
Meetings
>
1980's
>
1982
>
8/18/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:20:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
this contract, Engineer will observe the following requirements; <br />(a) Engineer will strive to complete his work <br />on the project within the time allowed by maintaining an adequate <br />staff of engineers, draftsmen, and other employees on the work at <br />all times. <br />(b) Engineer will comply with all Federal, <br />State, and.local laws applicable to this project. Engineer will <br />design the project in such a manner as to be in conformance with <br />all applicable Federal, State and local laws. <br />(c) Engineer will prepare all necessary <br />sketches to accompany the County's applications for any required <br />State, local, or Federal permits. <br />(d) Engineer will cooperate fully with the <br />County in order that all phases of the work may be properly <br />scheduled and coordinated. <br />(e) Prior to final approval of the design by <br />the Director of the Public Works Department, Engineer will com- <br />plete a preliminary check of construction plans with any county, <br />city, state or federal regulatory agency from which a permit or <br />other approval is required. <br />(f) Engineer will contact all utility com- <br />panies having installations in the vicinity of the proposed work <br />and notify said companies of the -time schedule for construction of <br />the project and relocation of utilities, if any. Engineer will <br />provide County with all information relative to any required <br />utility adjustments or relocations and will show all relocated <br />utilities on the plans. <br />(g) Engineer shall report the status of this <br />project to the Director of the Public Works Department upon <br />request and hold all drawings, calculations and related work open <br />to the inspection of the Director or his authorized agent at any <br />time upon reasonable request. <br />(8) The Engineer shall submit to the Director of <br />the Public Works Department two final sets of check prints for the <br />project. The Public Works Department will expeditiously review <br />the final check prints and <br />indicate <br />thereon any revisions <br />AUG 181992 <br />-5- <br />ox 51 PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.