My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/18/1982
CBCC
>
Meetings
>
1980's
>
1982
>
8/18/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:20:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG 181992 avx 1 FADE <br />technical assistance to help the Council on Aging and he <br />hoped the Board did not think it could be done without it <br />costing the County. <br />Mr. DeGenero stated that Mr. Mitchell was correct; he <br />did get to see some of the books, along with a Today <br />newspaper employee, but he would love to have a grand jury <br />investigation of the Council on Aging. <br />A brief discussion followed. <br />THE CHAIRMAN CALLED FOR THE QUESTION. It was <br />voted on and carried with a vote of 4 to 1, <br />with Commissioner Fletcher voting in opposition. <br />CHANGE ORDER - WATER PLANT CONTRACT <br />The Board discussed the memorandum of August 11, 1982 <br />from George Liner, Utilities Manager, as follows: <br />TO: The Honorable Members of the DATE: August 11, 1982 FILE: <br />Board of County Commissioners <br />THRU: Dr. C.B. Hardin r., Ph.D. <br />Acting County m nistrator <br />mo <br />II�' V <br />FROM: teorge Liner, <br />Utilities Manager <br />DESCRIPTION & CONDITIONS <br />Change Order #1 to Part III <br />SUBJECT: of Water Plant Contract (Gulf <br />Constructors International, Inc.) <br />REFERENCES: <br />Throughout the construction there were 21 item decisions made as <br />shown on the attached Change Order No. 1 to Part III of the contract <br />work. These are listed in the attached package showing the dollar <br />difference of each decision, whether additive or subtractive. Most of <br />the changes were from findings of regulation changes which caused minor <br />improvements of the design. The three major changes are: <br />#5 Change class 52 DIP to 51 DIP -$5,495.10 <br />#18 Add FRP reducers for flowmeter installation +$5,083.00 <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.