Laserfiche WebLink
SIGNATURES OF ACCEPTANCE <br />Project Director Authorizing Official of Governrf ental Unit <br />(only comminion chaimfan, Mayor, or Designates <br />Representa*e) <br />1. Name: Mr. James W. Davis, P.E. 1. Name: Don C. Scurlock r. Chairman of <br />the a rd of Co Co s o ers <br />2. Signature: 2. Signature: <br />3. Date: 3. Date: / ' 7' - <br />APPROVAL <br />APPROVAL FOR AUTHORIZATION TO PROCEED <br />1. Effective Date: 4. Name: <br />2. Federal Funds Allocated: 5. Title: <br />3. Approval Date: 6. Signature: <br />A�Jn �� mw <br />>� r� JOd '0 tc�r(n <br />Project Number: and leg; - rfici <br />At(0rr,„,Y -"/ <br />CHANGE ORDER FOR COUNTY JAIL - Bid Item No.5 <br />Public Works Director Davis informed the Board that <br />when certain electrical work was done at the jail recently, <br />it was necessary to split the existing 400 amp service into <br />two legs since it developed that the jail was pulling more <br />amperage than anticipated. The 400 amp service will be used <br />to supply the jail, and a new 200 amp service will have to <br />be installed to service the air conditioning. This is <br />underground service and will require some concrete work. <br />Mr. Davis noted that the architect is scheduled to be at the <br />meeting at 11:00 A.M. if the Board has any questions. <br />It was decided to defer this item until the architect <br />is present. <br />MEADOWS FRANCHISE APPLICATION <br />The Board considered the following memo: <br />20 <br />