My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/15/1982
CBCC
>
Meetings
>
1980's
>
1982
>
9/15/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2019 10:17:59 AM
Creation date
6/11/2015 2:30:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/15/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 15 1992 , <br />51 mt E <br />delay the air conditioning contractor, who needs to test the <br />equipment that has been installed. h <br />ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Fletcher, the Board unani- <br />mously authorized the Public Works Director <br />to negotiate a change order with the Contractor <br />with a net effect not to exceed $1,500.00. <br />PROJECT: 8122 -Improvements to Indian River CHANGE ORDER NUMBER: 8122-05-02 <br />(name, address) County Jail T Bid Item No. 5 <br />Electrical INITIATION DATE: September 15, 1982 <br />TO (Contractor) : <br />ARCHITECT'S PROJECT NO: <br />F Paul White Elctric, Inc. <br />602 6th Avenue CONTRACT FOR: Electrical Work <br />Vero Beach, F1. 32960 <br />I CONTRACT DATE: July 12, 1982 <br />You are directed to make the following changes in this Contract: <br />1) Install a new 225 amp, underground electrical service to the air conditioning <br />panel at the County Jail. The new meter and 225 amp main to be located on the north <br />side of the existing generator building. County to excavate ditch and cut, remove, <br />and restore concrete. <br />Add. <br />2) Delete 225 amp Circuit Breaker Delete <br />3) Delete four (4) type B fixtures in Deputies Room Delete <br />Total Additional Contract Cost <br />$3,809.00 <br />$ 173.00 <br />$2,742.60 <br />$ 893.40 <br />Nut valid until signed by both the Owner and Architect. <br />herewith, the Contract Sum <br />e� <br />Contract Timi, <br />Signature of the Contractor indicates his agreement including any adjustment ,n or <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ <br />21Y784.00 15 <br />o a <br />Net change by previously authorized Change Orders ................................... $+ <br />1,160.00 <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ <br />22,944.00 l <br />s m <br />1 he (Contract Sum) QQDQ@@00=9@@000CW will be (increased) (cam OU@b@Q= <br />893.40by <br />this Change Order......................................................... $ <br />The new (Contract Sum) including this Change Order will be <br />$ <br />23 837.40 "s <br />rn <br />°x <br />--- <br />\ <br />... <br />� <br />�- <br />E� • � <br />The Contract Time will be (?� r > ) (unchanged) by <br />) Crbiy <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />=. ;q al Q% <br />s <br />Auth:k- <br />.. <br />L <br />Jr. <br />ARCHITE( T CONTRACTOR OWNER <br />r Address Add( -15 Address <br />/ I / <br />BY <br />. <br />DATE l)All l ' 1� 1 �� Z DATE <br />%�Z4 <br />a <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.