Laserfiche WebLink
SANITARY-SEWER-S-0- <br />POLICY <br />ANITARYSEWER-S-UB- <br />POLICY -5.0-: A11 improvements for -replacement, expansion, <br />increase in capacity of facilities in the Indian -River Cou; <br />Utilities Department service area shall be compatible w1611 <br />adopted level of service standards for facilities. <br />POLICY 5-.-9-a Consisten <br />Use Element of this p <br />sewer service shall be <br />Figures -3-.". <br />Sub -Element. <br />OBJECTIVE 6 <br />i� provision of centralized sanitary <br />limited to the service areas shown on <br />inspections, operation and maintenance of on-site wastewater <br />treatment systemssi.n'gle a i7y units are exempteinorder to <br />maximize the-use--of-existing-county teeriits nddiscourage <br />urban sprawl. <br />.OLICY_-6-J. Use o onsite wastewater ti <br />shall -he limitedto-the following conditions: <br />Sys <br />° Existing septic tank and package treatment plants may <br />remain in service until such time Ias centralized service <br />is made available; at -such time the-county-shamsenforce <br />existing regulations requiring—single family units <br />within 200 feet of county sewer lines to connect to the <br />county system. When service is available, all units in <br />subdivisions within 1/4 mile of -the county sewer line <br />and all-commercial/industrial uses -shall be -connected to <br />.the county system. Residential units and/or <br />commercial/industrial establishments having a health <br />problem dile to their sewer treatment system must connect <br />to the regional system regardless of the distance. <br />Use of septic tank: systems for new development shall be <br />prohibited-urrl-ess--sutodevelopment meets -the Criteria <br />set on the water and wastewater connect_ion matrix on <br />Table 3.A.16. <br />° Use--af-package treatment plant -s ---shall be -limited to - <br />residential, commercial and light industrial d_evelopment <br />- <br />projects in areas .of the county inside the 2010 Urban <br />ServicereA as A c do have access to he existing <br />e�unty--system-,-with-the-requirement-that when the county <br />system is extended to this_area, these developments must <br />connect to the regional system and pay the appropriate <br />tees. T county unty shall modifyits ran -develop-ment <br />regu-lations by-September-190-to-requi-re-the-developer <br />to construct a dry line at -the -time of -construction when. <br />1 the above criteria apply. <br />63 <br />SmeadSoft Reprint Date: Monday, August 12, 2013 - 15:22:19 - OfficialDocuments:672, Attachment Id 0, Page 45 <br />