My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/19/1983
CBCC
>
Meetings
>
1980's
>
1983
>
1/19/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:00 AM
Creation date
6/11/2015 2:47:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/19/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO. Board of County Commissioners DATE' <br />. January 10, 1983 FjLE'; <br />THRU: Michael Wright <br />County Administrator <br />SUBJECT: IRC Bid #153 - (1) Truck Mounted <br />3/4 yd. Crane/Dragline, 20 Ton <br />Carolo rich !REFERENCES: <br />Purchasing Department Manager <br />Y. Description and Conditions <br />Bids were received December 21, 1982 at 10:00 A.M., for IRC Bid #153 - (1) <br />Truck Mounted 3/4 yd. Crane/Dragline, 20 Ton (Minimum crane rating), for the <br />Road 6 Bridge Department. <br />This machine is used for bridge repair and digging of shell. It will replace <br />the old Koering dragline (1970 Chassis, 1964 Cab) which is in very poor condition. <br />It is intended that this machine be sold at auction. <br />8 Bid Proposals were sent out. Of the 6 Bid Proposals received, 5 were f°No <br />Bids", r(See attached Tabulation sheet for reasons for "No Bid"). <br />2. Alternatives and Analysis <br />The only bidder was H F. Mason Equipmexit Co Oporation, Hialeah9, FT.�'in csie <br />amount of $149,851,00 for a Little Giant Model 48. 1'he.folloptions are <br />offered: ow <br />3/_4 yd. Dragline Bucket $35387.00 <br />Weighload System (Installed) 7,780.00 <br />3. Recommendationand Funding <br />It is recommended that IRC Bid #153 be awasxued to the only `uldder, H. F, M*-tson <br />for a Little Giant Model 48, ($149,85.1_,00) with the optional Weighload SysL:em <br />($71780.00), for a total of $357;631.00. <br />The optional bucket is not required, as the Road & Bridge Department has a <br />bucket that can be used on the dragline. <br />There is $1929000.00 budgeted in Account #004-214-541-66.43 for the purchase <br />of a dragline. <br />Purchasing Manager Goodrich reported that they were able to <br />find only one manufacturer who supplies a dragline of this size. <br />Discussion ensued re being able to assure -this is a competitive <br />price. <br />Public 11orks Director Davis noted that many manufacturers <br />who used to produce these size draglines no longer do so. <br />39 000K PAVE cog_ <br />JAN 19 193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.