Laserfiche WebLink
Staff recommends that a deceleration -taper lane be constructed <br />by the developer along U. S. #1. This lane should be 0' (0 <br />feet) wide at the northern boundary of Tract 1 and taper to 12' <br />wide at the entrance to the shopping plaza (a distance of <br />141.41, as platted). This would eliminate southbound traffic <br />which is entering the shopping plaza from having to practically <br />stop on U. S. #1 to complete their turn. In constructing this <br />taper lane, the developer should be responsible for relocating <br />any sidewalks, curbing and powerline poles as may be necessary. <br />The developer must get all D.O.T. permits as required. <br />4) In order to avoid possible accidents from traffic entering <br />and exiting the shopping plaza, it is also recommended that the <br />inbound traffic be limited to one lane in the entrance drive <br />and that the second inbound lane, which has been proposed on <br />the site plan, should be utilized as a traffic divider with a <br />10' wide planter median being constructed in it. <br />5) Staff also recommends that the 25' wide drive which paral- <br />lels the retention basin and curves around the northeast corner <br />of the property be reconstructed so that it is a stub street <br />which extends to the property line, rather than a curve. <br />6) Staff further recommends that the applicant dedicate to the <br />public an ingress and egress easement at the -entrance to <br />Luria's Plaza Shopping Center, this easement should curve to <br />the north with the parking pavement and parallel the retention <br />basin. It should continue to the border of the property. This <br />easement should be 48' wide at the entrance to the development <br />and continue at this width for 233' at which point the easement <br />should curve north. The easement should be 25' wide as it <br />parallels the retention basin until it reaches the northern <br />border of the property. The reason for this recommendation is <br />so that if future commercial development were to occur on the <br />site immediately north of the property, internal traffic <br />circulation among all the commercial developments along U.S.#1 <br />in that area would be insured. <br />The Florida Department of Transportation was contacted in <br />reference to these recommendations. Mr. Paul White, of D.O.T:, <br />stated that permits are issued by D.O.T. for construction of <br />deceleration lanes on U. S. #1 and, in fact, deceleration lanes <br />on U. S. #1 are encouraged by D.O.T. to facilitate traffic <br />flow. <br />The applicant has been informed of all staff recommendations <br />and is willing to comply with Items 1, 2 and 5. However, they <br />are not willing to comply with Items 3, 4, and 6 that is, con- <br />struction of a deceleration taper lane, construction of a 10' <br />wide planter median in the center of the entrance drive and <br />dedication to the public of an ingress and egress easement at <br />the entrance way and along the eastern edge of the parking lot. <br />The applicant has stated they would be willing to install a <br />traffic signal at the entrance of the development. However, <br />the County Traffic Engineer has said that a deceleration lane <br />would facilitate traffic movement on U. S. #1 to a greater <br />degree than a traffic light would. Traffic turning right into <br />the shopping center would not have to come to a stop on U. S. <br />#1 if a deceleration lane were constructed. Traffic turning <br />left into the shopping center can use_the existing center turn <br />lane. A traffic signal at the entrance would force all traffic <br />to stop. A deceleration lane, used in conjunction with the <br />existing center turn lane, would remove traffic entering the <br />shopping center from the traffic flow, without forcing all <br />traffic on U. S. #1 to stop or significantly reduce their speed. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners deny <br />the preliminary plat approval request for Luria's Plaza at Vero <br />Beach Subdivision unless and until the applicant complies with <br />the conditions listed herein. <br />34b <br />