Laserfiche WebLink
ORDINANCE 2012-019 <br />update the traffic counts in the concurrency management database. It will be <br />the responsibility of the applicant or engineer to obtain traffic count data on <br />those links for which data are not currently available, or as specified during <br />the pre -application meeting. <br />24. Roadway characteristics inventory. A roadway characteristics inventory wi44 <br />shall be maintained on each segment in the transportation links database. The <br />features inventory will include road segment identification (name of street, <br />state or county road number and termini), existing road and group type, <br />jurisdictional responsibility, performance standard, length, right-of-way type <br />and width, date of traffic count, counted volume, adjusted average daily <br />volume, peak hour, peak direction, peak season volume, vested development <br />volume, existing service level volume, future service level volume, and the <br />segment specific available capacity. This inventory will be updated as new <br />information becomes available and is approved by the director of public <br />works. <br />3-5. Socioeconomic database. A socioeconomic database will be maintained by <br />TAZ. This database w41 -shall contain pertinent characteristics about the <br />single-family and multifamily population, dwelling units, vacancy rate, and <br />auto ownership. Additionally, the SE database will maintain information on <br />the number of commercial, service, industrial and total employment. <br />46. Concurrency determination network map. A concurrency determination <br />network map will -shall be maintained by the community development and <br />public works departments that illustrates all roads on the Indian River County <br />traffic impact study network. This map will include those road segments <br />scheduled for completion within the first three years of the FDOT, Indian <br />River County, and local jurisdictions five-year capital improvement program, <br />and those roads scheduled for completion within three (3) years that will be <br />Bold Underline: Additions to Ordinance 12 <br />S!FikO t:fough: Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-019 952 and 910 Traffic.doc <br />