Laserfiche WebLink
ORDINANCE 2012-019 <br />be required for churches and other land uses as determined by the director of public <br />works. The data will include a summary of traffic count data by fifteen -minute <br />increments with a.m., p.m. and other peak hours being highlighted as well as the <br />peak hour to daily traffic ratio and peak hour directional split. All data will be <br />subject to review and acceptance by the director of public works. This review will be <br />based on currently accepted traffic engineering principles. <br />(f) The applicant or his engineer will -shall provide turning movement counts as required <br />by the director of public works. These turning movement counts shall be made from <br />7:00 a.m. to 9:00 a.m., 11:00 a.m. to 1:00 p.m., 3:00 p.m. to 6:00 p.m. or as <br />otherwise specified by the director of public works. Legal holidays or other days as <br />specified by the director of public works shall be excluded. Friday, weekend, or <br />holiday turning movement counts may be required for churches and other land uses <br />as determined by the director of public works. The data shall include a summary <br />of traffic count data by fifteen -minute increments with a.m., p.m. and other peak <br />hours being highlighted as well as the peak hour to daily traffic ratio and peak hour <br />directional split. All data will -shall be subject to review and acceptance by the <br />director of public works. This review will -shall be based on currently accepted <br />traffic engineering principles. <br />(4-3Background traffic considerations. <br />(a) For non -DRI size projects, the available capacity of each segment -shall be <br />provided by the county. The effect of the background traffic on each segment <br />contained in the concurrency determination network will be considered through the <br />combined impact of the existing development for which either an initial or final <br />concurrency determination has been issued, and all segments where CO's have been <br />issued but no updated traffic counts have been made since CO issuance. Therefore, <br />only the impact of the development traffic shall be provided in the traffic impact <br />study for the purposes of a concurrency determination for a non -DRI size project. <br />(b) For DRI size projects, the procedure to estimate background traffic -shall be <br />defined at the DRI traffic methodology meeting and will -shall consider the impacts <br />of all vested development, including development vested prior to September 1, 1990. <br />0-4133 Trip generation. <br />(a) Each traffic impact study shall list all land uses, applicable ITE land use code, <br />size and/or dwelling units. <br />(b) Allowable sources for trip generation rates for each land use listed in (a) above are <br />identified below: <br />1. <br />The tfip generation rate€efth if land , as identified in the lad <br />River- r + T ' Rate and no,.,.ei4 New Trips Dao Table The Institute of <br />Transportation Engineers Trip Generation Manual, latest edition; <br />Bold Underline: Additions to Ordinance 14 <br />Stfike thFOH& Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-019 952 and 910 Traffic.doc <br />