Laserfiche WebLink
M <br />Tele pno ne: (3051 567-8000 <br />rte, <br />BOARD OF COUNTY C0iMISSIONERS <br />1840 25th Street, Vero Reach, Florida 32960 <br />Mr. Richard B. Chisholm, President <br />Barry's Ornamental Iron, Inc. <br />1164 18th Place <br />Vero Beach., Flo-rida 32960 <br />Subject: Indian River County Project Number 8122 <br />Indian River County Jail Improvements <br />First Floor Security Door <br />M <br />Suncom Telephone: {305) 424-1012 <br />September 8, 1982 <br />Reference Letters: 1) Richard B. Chisholm to James Davis dated August 6, 1982 <br />2) K. 5. Hedin to Barry's Ornamental Iron, Inc. dated <br />August 3, 1982 <br />Dear Barry: <br />After reviewing your letter of August 6, 1982 and the August 's, 1982 letter <br />by K. D. Hedin, it appears that clarification of the actual details of our dis- <br />cussions during the :Leek of June 7=11, 1982 should be made. In reviewing our <br />file, the following scenario took place: <br />June 4, 1982 - Bids were received for Project 8122 - Indian River <br />County Jail Improvements - Five bid items were let for bid; <br />however, only 4 bid items i•:ere actually bid. Bid item No. 1, <br />Miscellaneous Site Work, was not bid. Barry's Ornamental <br />Iron Works agreed to submdt a quotation to perform this work <br />which included installation of a Secure Steel Door on the <br />First Floor (north side) of the ;rail. <br />June 9, 1982 - Barry's Ornamental Iron �;orks, gave a verbal quota- <br />tion via telephone in the amount of 56,200. to perform the <br />work specified in Bid item .No. 1 which included miscellaneous <br />concrete work, second floor door and the first floor steel <br />door in question. The first floor steel door was bid at <br />approximately $4,200. Based on this verbal quote, the Public <br />Works Department drafted a memo.to the Board of County <br />Commissioners for their approval. <br />June 16, 1982 - During the regularly scheduled meeting of the Board <br />of County Commissioners, the Board approved a Change Order in <br />the amount not to exceed $6,200. and instructed Barry's Orna- <br />mental Iron Works to proceed to construct those items in Bid <br />item No. 1. <br />Y <br />July 1, 1982 - A written proposal was submitted by Barry's Orna- <br />mental Iron, Inc., for the work to be performed under Bid <br />Item No. 1 (same as above). Since the June 16, 1982 verbal <br />proposal, it was discovered that an electric lock was re- <br />quired. The tirritten proposal priced the door at $S,788.00 <br />instead of the $4,200. originally proposed. Upon receipt <br />of this proposal and during the week of July S, 1982, I <br />discussed this cost change with you and indicated that I <br />as Public works Director did not have the authority- to approve <br />the increased expenditure of approximately $1,588. I explained <br />M <br />40(11( 53 <br />SAGE <br />