My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/7/1983
CBCC
>
Meetings
>
1980's
>
1983
>
9/7/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:02 AM
Creation date
6/11/2015 3:11:21 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/07/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F17 - <br />SEP 7 1983 `Ac 4 . <br />they had initiated a change order to provide a better <br />channel, which resulted in an additional cost of $450. He <br />felt the benefits derived from the change far outweighed the <br />additional cost. The water was very shallow at low tide, <br />especially near the boat ramps. <br />ON MOTION by Commissioner Lyons, <br />SECONDED by Commissioner Scurlock, the <br />Board unanimously approved final payment <br />in the amount of $8350 to Florida Marine <br />Contractors for the Oslo Daybeacons, <br />Project #8218, as recommended by staff. <br />REVISION to 1983 ROAD PROGRAM- PAVING OF JOSIE STREET IN <br />RO.gP..T.&NT) <br />The Board reviewed the following memo dated 8/26/83: <br />TO: The Honorable Members of the DATE: August 26, 1983 FILE: <br />Board of County Commissioners <br />THROUGH: Michael Wright, <br />County Administrator <br />SUBJECT: Revision to 1983 Road Program - Paving <br />of Josie Street in Roseland <br />FROM: James W. Davis; P.E. , REFERENCES: <br />Public Works Directo <br />DESCRIPTION AND CONDITIONS <br />During the February 16, 1983 meeting of the Board of County Commissioners, the <br />attached 1983 Road Improvement Program was approved. As of this writing, all <br />projects have been constructed or are being finalized with the exception of the <br />following: <br />1 b. Resurfacing of Gibson Street in Roseland <br />Cost = $24,600 <br />It has been determined that this road is not in critical need of <br />resurfacing at this time. <br />l*d. Resurfacing Kings Highway from 4th Street to 12th Street (cost $48,380) <br />Due to the close proximity of a Grove canal to the West between 8th <br />Street and 4th Street, resurfacing has only been constructed between <br />12th Street and 8th Street. Plans are currently -being made to include <br />the remaining work in FY 1984. <br />57 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.