Laserfiche WebLink
As a result of the Gibson Street Project being eliminated and the Kings Highway <br />resurfacing being -delayed until Fiscal Year 184, there is approximately $44,000 <br />available for an additional project. After all planned work is finalized, the <br />Road and Bridge Department Road Material Account (Line item 35.39) should have <br />an unused balance surplus of approximately $74,000. <br />At this time, the Roseland Volunteer Fire Department and other residents in <br />Roseland have verbally requested that the County consider the paving of Josie <br />Street from Roseland Road to Elaine Street (see attached map). Since the Fire <br />Station and Public Park are both located on this road, the road serves other <br />functions than simple access to abutting property. The Roseland Station -Fire <br />truck has recently suffered damage due to the condition of the road. <br />Cost to pave the approximately 2000 Z.F. of road with Double Surface Treatment <br />and a Soil Cement base would be approximately $23,000. The cost to pave Josie <br />Street with the smoother D.Or.T. Type III asphalt is approximately $28,000. <br />ALTERNATIVES AND ANALYSIS <br />The following alternatives are presented: <br />1) Approve paving 2000 L.F. of Josie Street with D.O.T. Type III asphalt <br />at a cost of approximately $28,000. <br />2) Approve paving 2000 L.F. of -Josie Street with Double Surface Treatment <br />at a cost of approximately $23,000. <br />3) Approve paving of Josie Street from the Fire Station and Park to Roseland <br />Road - Approximately 1000 lineal feet - cost = $14,000. <br />4) Additional unspent funds would be unencumbered and no additional projects <br />be approved. <br />RECO*fMATION AND FUNDING <br />It is recommended that Alternative No. 1 be approved and that Josie Street be <br />paved between Elaine Street and Roseland Road at a cost of $28,000. Funding to <br />be from 004-214-541-35.39, uncommitted balance is $118,000. The unencumbered balance <br />as of August 18,.1983 is $233,500. <br />Public Works Director Davis explained that the original <br />approved FY 1983 Road Improvement Program was completed, <br />except for the resurfacing of Gibson Street in Roseland, and <br />the widening of Rings Highway from 4th Street to 12th <br />Street. Due to these two projects being deleted from this <br />year's budget, there is approximately $44,00 available for <br />an additional project, the paving of Josie Street in <br />Roseland. He reported that.Rpseland had requested that <br />Josie Street be paved as there is a fire station and a park <br />located on the street. <br />58 <br />SER 7 1983 <br />