Laserfiche WebLink
ROV 16 1993 IACD;, 1 <br />MOTION WAS MADE by Commissioner Lyons, <br />SECONDED by Commissioner Wodtke, that the <br />Board postpone the Public Hearing and authorize <br />the Public Works Department to work with the <br />property owners to consider a drainage revision on <br />the 8th Ave. S.W. paving project, as recommended <br />by the County Administrator; and to reschedule and <br />properly advertise another Public Hearing in the <br />future. <br />Mr. Ellison asked if the next public hearing could be <br />held in the evening and Commissioner Lyons advised that <br />before it comes back before the Commissioners at a Public <br />Hearing, there will be another informal evening meeting with <br />the property owners and Public Works Dept. staff <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />The Motion was voted on and carried unanimously. <br />APPROVAL OF SOUTH COUNTY WATER SYSTEM IMPROVEMENTS — CHANGE <br />ORDER #2 <br />The Board reviewed the following memo dated 11/7/83: <br />TO: The Honorable Members of theDATE: November 7; 1983 FILE: <br />Board of County Commissioners <br />THROUGH: Michael Wright <br />County Administrator <br />SUBJECT: SOUTH COUNTY WATER SYSTEM <br />IMPROVEMENTS - CHANGE ORDER <br />FROM: Terrance G. Pinto REFERENCES: Contract Change Order from <br />Utility Services Director Water Services of America <br />DESCRIPTION AND CONDITIONS: <br />Water Services of Americahave requested a price adjustment for <br />manufacturers field services in accordance with Section C. Bid and <br />Section 2A, paragraph 2A(3)d of the contract documents. The contract <br />will be increased by thirteen thousand six hundred fourteen and <br />3811100 dollars ($13,614.38). <br />RECO` 111ENDATION : <br />Staff recommends the Board authorize the Chairman to sign the change <br />order. <br />54 <br />