My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/7/1983
CBCC
>
Meetings
>
1980's
>
1983
>
12/7/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:03 AM
Creation date
6/11/2015 3:50:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/07/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 7 19 <br />I <br />DEPARTMENTAL CORRESPONDEN <br />�?�• �� '`' ` `®J Nave <br />DATE <br />J :( <br />L � <br />SUBJECT STEEL POLE RELOCA,70N, .►UtS�#3�'TD 8t1� STREET <br />� J <br />M .� <br />f i Cit ' E <br />Mana <br />To Mr. J. V. Little DEPT y g <br />r <br />FROM F. H. _Call ��� ��~�� DEPT Electrical <br />5-5 PACE 589 <br />Bids were opened October 20, 1983 for installation of the embedded <br />section of the steel pole to be relocated at the intersection of US#1 <br />and 8th Street. The bid also includes the removal of the existing <br />embedded section. <br />The low bidder is Power Systems Construction Company, Inc., located <br />in Jacksonville Beach, FL, in the amount of $33,940.00.- After the <br />bids were opened, we negotiated with Howell Brantley and he reduced <br />his price to $31,900.00, per the attached letter dated November 15, '83. <br />I recommend we accept Power Systems Construction Company's bid based <br />on the negotiated price of $31,900.00. Please place this on the. City <br />Council agenda of December 6, 1983. <br />Our original estimate to perform all work associated with the reloca- <br />tion was $39,890.00 as outlined in a letter to Jim Davis, I.R. County <br />Public Works Director, dated January 4, 1983. The revised cost is as <br />follows: <br />Material and Freight $ 7,645.00 <br />Contract for Installation and <br />Removal of Embedded Section 31,900.00 <br />City Crews to Install Top Section, <br />Transfer and Associated Work 5,200.00 <br />Black & Veatch Billing 291.00 <br />TOTAL COST $45,036.00 <br />Administrator Wright assured the Board that his <br />recommendation that the bill be paid comes to them after <br />numerous hours with the City and a good bit of -research by <br />our Attorney. <br />MOTION WAS MADE by Commissioner Scurlock, <br />SECONDED by Commissioner Lyons, to authorize <br />the payment of $45,036 for relocation -of the <br />steel pole at the intersection of US #1 and <br />8th Street as recommended by the Administrator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.