My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/16/1984
CBCC
>
Meetings
>
1980's
>
1984
>
5/16/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:23:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/16/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />WATER; SERVICES OF AMERICA, Inc. <br />Mr. Terrance Pinto <br />Utilities Director <br />South Indian River County RO Plant <br />Utilities Department <br />P.O. Box 1750 <br />1840 25 th Street <br />Vero Beach, Fl. 32960 <br />Dear Mr. Pinto: <br />Rte: R.O. Plant Modification <br />Capacity Increase <br />WSA Proposal No. 5865 <br />April 1991984 <br />As a result of our past discussions on the proposed modification <br />of the Indian River Reverse Osmosis P1ant,I have prepared the - <br />following summary of several of the key points which should <br />be considered during the evaluation of our proposal. <br />The WSA proposal for plant modification consist of the addition <br />of - seven (7) ten inch -B-9 DuPont membranes to each of the <br />four membrane racks currently in service. This addition will <br />increase the capacity of each membrane rack by 165,000 GPD <br />for a total plant increase of 660,000 GPD. The existing RO <br />plant was purchased for a total of p 1,217,091.00. This equates <br />to about $ 0.61 per gallon per day capacity. The proposed <br />modification will increase the total plant capacity by 660,000 <br />aDafr only $ 175,000.00 or only 0.26 per gallon per day <br />capacity. <br />y. <br />Since the cost of the original plant included several items <br />sized for ultimate plant expansion, it may also be helpful to <br />compare the cost of the proposed modification to the cost <br />of purchasing a new system sized for 660,000 GPD capacity. <br />Such a plant would cost approximatly $ 380,000.00. The <br />porposed modi�icatio will provide the same cacacity increase <br />for less than half the cost of a seperate system . <br />Another significant savings results from the fact that the <br />Proposedc�modification will increase the plant capacity by <br />about 25,/ without any increase in total power consumption. <br />The energy required to feed the additional membranes is <br />currently being wasted accross a feed pressure control valve. <br />By utilizing this wasted energy, the proposed modification <br />will reduce the specific electrical consumption cost from <br />about $ 0.51 / 1000 gallons to about a 0.41 / 1000 gallons. <br />Additional savings will also be realized since the increase <br />in RO capacity will also increase the blend water capacity <br />while not increasing the operating cost. <br />This proposal reflects special pricing by DuPont for <br />membranes they wish to provide for close field service monitor- <br />ing. DuPont wishes to start the collection of data as soon <br />as possible. Therefore this offer is for acceptance within <br />thirty (30) days, with delivery and installation of the first <br />70 <br />RAY 16 1994 <br />_ BOOK 57 PACE103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.