Laserfiche WebLink
MAY 16 1994 BOOK 57 PAA04 <br />rack of membranes within sixty days after receipt of your order. <br />The installation of the remaining three racks of membranes may <br />be spaced out thru 1985 when this offer expires. <br />All new membranes will carry the standard DuPont three year <br />warrantee, commencing when the membranes are placed in service. <br />The warrantee in effect for membranes currently in service will <br />not be affected in any way as a result of this proposed <br />modification. <br />The significance of this special pricing can best be realized <br />by comparing the unit cost for the membranes offered in this <br />proposed modification with our current list price for these <br />membranes. The current list price for these membranes is <br />10,750.00 each or a 301,000.00 for twenty eight (28) <br />membranes. This WSA proposal offers these membranes for only <br />6,250.00 ea or $ 175,000.00 if purchased in 1984. <br />There are also several other circumstances which justify <br />the necessity to act promptly upon this propsed modification. <br />This proposal is specifically offered to WSA for use at. the <br />Indian River RO plant. In order to take advantage of this <br />special pricing it will be necessary to accept this offer <br />and install the first seven (7) membranes by May 1, 1984. <br />Since this offer is being made thru the DuPont Licensee who <br />supplid the Indian River Plant, this offer will in no way <br />affect the existing warrantee. The necessity to protect the <br />existing warrantee is one reason that the WSA offer can not <br />be matched by any other supplier. In order to fully protect <br />the county with respect to the plant warrantee, it would be <br />necessary for any other supplier to also accept the full <br />plant warrantee and to secure a performance bond to support <br />that wa--rantee. This increased liability for another supplier <br />can only result in increased cost to the county. <br />WSA has also investigated the use of alternate membranes for <br />use in this modification as WSA is also a licensee of both <br />Dow and Pilmtech membranes. However, our evaluation has <br />`concluded that; first, no significant savings could be made <br />without extensive equipment modification, secondly, the use <br />of an alternate membrane would greatly compromise the options <br />available for modifying the pretreatment system to reflect <br />the latest cost saving technological developments. <br />In summary, this proposed plant modification is an excellent <br />opportunity for Indian River to expand its R.O. Plant <br />camacity at the lowest posible capital cost while also <br />reducing the operating cost of producing water at this <br />facility. <br />Should you have any questions concerning this matter please <br />feel free to contact me at ( 305) 755-1874 . <br />Yours very truly, <br />-/Serge Latour <br />Regional Manager <br />71 <br />