Laserfiche WebLink
JUL 111984 Boox-uG97 <br />is being changed; it is now July 1st instead of January 1st, <br />but he did not believe the MSTU could be in place in this <br />year. <br />Director Davis emphasized that it is not our intent to <br />rush this thing; it probably will take a year. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously (4-0). <br />16TH STREET CHANGE ORDER <br />Administrator Wright explained that the contractor was <br />working on the road just east of the intersection of Old <br />Dixie and 16th Street by Florida Cablevision, and it was <br />discovered there are three people who are currently hooked <br />up to a private force main which was left off the drawings, <br />and which runs to the west on the south side of 16th Street <br />and intersects a city manhole west of Old Dixie. This main <br />is only 2" or 3" under the final grade of the road so it <br />obviously has to come out. There is about 600' or 800' of <br />pipe involved, and Dickerson has a Change Order showing a <br />cost of $12,850. There are two or three others across the <br />street who are supposed to connect to it. The Administrator <br />believed that Director Davis has contacted two of the owners <br />currently on this line, and they each have agreed to pay 1/5 <br />of the relocation cost. <br />Mr. Davis confirmed that he contacted the third owner, <br />Earman Oil Co., and they are going to call back. Action <br />Printers and Scott Plaza each have indicated they would be <br />willing to pay 1/5 of the cost to relocate the line as they <br />are having Health Department problems. Four out of the five <br />who will be on the line have given verbal consent to sharing <br />an assessment to relocate the line. When it is relocated, <br />it will be enlarged to 4" as the City will not accept it <br />until it is brought up to City standards. <br />