Laserfiche WebLink
CHANGE <br />ORDER <br />A/A 1)U( U,%1L N 1 C701 <br />I11.11ibulloo jo <br />OWN LR <br />ARCIIITFCT <br />CON I RAC.: TOR <br />FIFLU <br />011 ILR <br />PROJECT. 43rd Ave. Water Main Extension <br />r,am,l(1;irr»1 at South Gifford Road <br />TO IContractut) <br />Owl & Associates, Inc. <br />115 Springline Drive <br />Vero Beach, F1. 32963 <br />CLIA .C;L e ?Rt)I K NUMt1LR <br />IN111ATMN DATE. <br />1 <br />ENGINEER . I'K( )IEC I NO: <br />CONTRAC 1 FOR. Water Main Extension <br />CONTRACT DATE August 3, 1984 <br />You are directed to make the toliowing changes to this Contract: <br />Bid Item 2.01 Increase quantity for 8" PVC Water Main by 2825 L.F. (from <br />1480 L.F. to 4305 L.F. ) to extend Water Main to 38th Ave. <br />and Jail site. <br />Increase Contract amount 2825 L.F. @ 9.75 per L.F. = $27,543.75 <br />Bid ITem 2.05 Furnish and install 1 Fire hyrdant Assembly including valve, valve <br />box, and assoc. 'piping <br />Incrdase quantity from 2 to 3. Increase Contract $ 1,275.00 <br />Bid Item 2.06 Furnish and install 8" gate value and box <br />Increase quantity from 5 to 6. Increase Contract $ 480.00 <br />Bid Item 2.07 Furnish and install cast iron fitting (8" tee & 8" x 6" reducer) <br />Increase quantity from 1600 LB•to 2136 LB <br />Increase Contract by 375.00 <br />Bid Item 2.09 Furnish and install temporary Blow -off Valve Assembly <br />Increase quantity from 1 to 2 <br />Increase Contract by 110.00 <br />Additional Item 1 Perform wet tap into existing 6" water main including tapping ' <br />saddle, valve, valve box, thrust blocks, reducer, and all <br />-necessary fittings to perfoXn a_sompletP tap 995 D(1 <br />Not •,;ild until signed by moth the Owner and Architect. TOTAL CONTRACT INCREASE $30,778.75 <br />Signature r:( the Contractor indicates his agreement herewith, including any adjustment n tcc• C•t,ntrai t Burn or Ct.nira(t Time. <br />The original (Contract Sum) (OAAAWAN,iz("/t7 hAl was ................. ......... $ 43,182.00 <br />Net change by previously authorized Change Orders ................................... $ –0– <br />The 'ContraLt Sum) A'.W a/tfcMItAii!r iiOJT/ ithitf prior to this Change Order •say ..... .... $ 43,182.00 <br />The !Contract Sum) S)(�fyfefc /r7Gy/a)fyfrft/ry{/�%y�,ij will be uncred-,ed) (r(�ir�, ,�r/l/fnl ,()� <br />by this Change Order......................................................... $ 30,7 78.75 <br />The new (Contract Sum) (�;�u��►atl�I�A fit ut� including this Change Order will he .. S 73,960.75 <br />The Contract Time will be (increased) by Thirty Calendar days ( 30 ) Oays. <br />The Date of Substantial Completion as of the date of this Change Order therel(xe 1, <br />Indian River County Public Works <br />t It 0 25th Street <br />Addie» <br />Vero Beach, Florida <br />BY <br />DA 11 <br />Owl & Assoc., Inc <br />colTfg"Storingline Dr. <br />Addres, <br />Vero Zeach, Florida <br />James W. Davis, P.E. <br />DAN <br />Authorized: <br />Indian River County, F1. <br />t'•"•1940 25th Street <br />A,ddre.s <br />Vero Beach, Florida <br />S, Don <br />Scurlock, Jr. _ <br />Chairman, Board of Co. Comm. <br />- l)AIE <br />------ ------ - <br />AIA UUCLMtiT (; ui ( tti'..t,E n I <br />INE AMtKICAN INN IIIUIt Uf AKl til Itl 85• 1.1, %t '+.ink Ak •, AA,tt11\, t, i'. t, ♦nw. <br />63 <br />G761 — 1978 <br />BOOK ,8 F'GE 99 <br />