My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/1984
CBCC
>
Meetings
>
1980's
>
1984
>
10/17/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:26 AM
Creation date
6/11/2015 4:51:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Director Pinto reported this is virtually the same group who <br />were interested in water, but a few more names have been added <br />who would like wastewater service to that area. They have funded <br />through the advance portion of their impact fees enough money to <br />design the force main system that is needed. This is a non- <br />refundable fee. Mr. Pinto stated that they would like to move <br />ahead with the engineering with the intent of servicing that <br />area. <br />Chairman Scurlock noted that the process used here was move <br />ahead with some owners working with the County and expand the <br />scope of services because of the time issue. <br />ON MOTION by Commissioner Wodtke, SECONDED <br />by Commissioner Lyons, the Board unanimously <br />approved Work Authorization #002 for Carter <br />& Associates/Williams, Hatfield & Stoner to <br />engineer and design the wastewater force main <br />and collection system for the Route 60 area. <br />INDIAN RIVER COUNTY <br />DATE: October 10, 1984 <br />WORK AUTHORIZATION NO. 002 FOR ENGINEERING SERVICES <br />PROJECT NO. <br />(County) 2130-2 SR (Carter/WH&S) <br />TITLE: Design of State Road 60 Force Main/Pump Station Network <br />I. PROJECT DESCRIPTION <br />The Consultant is to provide the necessary design and contract <br />administration services to facilitate the public bidding of approximately <br />five and one-half miles of force main and four pump stations to provide <br />interim wastewater service along the State Road 60 corridor. The design <br />will include the recommendations included in a letter report to the <br />County dated July 20, 1984 with one modification as described in scope of <br />services below. <br />45 <br />OCT 17 1984 BOOK i, F sS <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.