My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/1984
CBCC
>
Meetings
>
1980's
>
1984
>
12/19/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:26 AM
Creation date
6/12/2015 10:01:55 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/19/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
View images
View plain text
DEC 19 ISM <br />BOOK p,�;r <br />CHANGE ITNtitlmlion <br />ORDER OWNIR U <br />ARClllTLC1 ❑ <br />AIA 00CUMEN1 G, 01 (C)N1RAC10R D <br />nruT CI <br />C)IIIIR L1 <br />PROJECI: 8433-S. Gifford Road Water Cf1ANC.E ()Rl)l.R NUMBER: 8433-2 <br />(name. address) Main -- <br />Jail. Site/Road & Bridge INITIATION DATE: December.7, 1984 <br />TO (Contractor). <br />ENGINEER' S. PROJECT NO: 8433 <br />William Lampe,.President <br />Owl and Associates, Inc. CC)NTKACI FOR: Water Main Extension <br />115 Springline Drive <br />Vero Beach, FL 32963 J CONIRACT DAIS: August 3, 1984 <br />You are directed to make the following changes in this Contract: <br />Item 2.06 Delete 1-811 Gate Valve <br />Decrease Contract <br />Add Item 2.12 Furnish and install 1=12" Increase Contract <br />and 1-611 hydrant extension <br />at S. Gifford Road & 43rd.Ave <br />Add Item 2.13 Install 811 Gate Valve at <br />Jail Site <br />Item 2.11 Extend performance bond to <br />accomodate work in C.O. 1 <br />Increase Contract <br />($480.00) <br />$359.00 <br />$145.00 <br />$307.00 <br />TOTAL CONTRACT INCREASE -THIS CHANGE ORDER- - - - - - - - - - -$331.00 <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum ar Contract rent• <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ <br />Net change by pre%iously authorized Change Orders .................... .............. $ <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order wds .......... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (mcredsed) (decreased) (unchanged) $ <br />by this Change Order • "' <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ <br />The Contract Time will be OF*MM (X(YcYcX* 0 (unchanged) by <br />43,182.00 <br />30,778.75 <br />73,96Q.75 <br />331.00 <br />74,291.75 <br />( <br />The Date of Substantial Completion as of the date of this Change Order therefore is November 2, 1984 <br />Authorized: <br />Days. <br />ARC_HITECiIn lan <br />River , CouIlt)rc0 TR. ( T R <br />� Associates, Inc. <br />OWNER <br />Indian River County <br />Ptib]iC,.-W�rkG <br />Address <br />n,v,s,oil_..�w <br />Addres, 115 Springline Dr. <br />Addre,s 1840 <br />25th Street <br />Vero Beach, FL 32963 <br />Vero <br />Beach, FL 3296 <br />I <br />�-� <br />/ G <br />ey <br />—_- <br />---- I.t" illiam Lampe, �resident'Bo <br />C:ur 0c1c, airm: <br />Becember <br />DAIL <br />_ _ _ ;).ATt , ___n.AII <br />19, 1984_ <br />AI/1 UOCUh/ENT G70t CHA!rl.t URUEI( APRII 14:P kAIA- 1 n <br />�W. <br />THE: AMERICAN INSTITUTE Of ARC:HIIEC15, Illi hEW 1URA ASE.A�HIhI.I()N, I) l :tr M� <br />Approved S <br />and leo <br />O�f�Etl ly7$ <br />IefICV� .j <br />19a <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).