Laserfiche WebLink
MAR 2 0 <br />1985 <br />Booz CO <br />264 <br />since <br />there is a certain amount of risk involved relating <br />to the <br />possibility of a permit for our wastewater not being received, <br />then all the development that has proceeded with the dry line <br />permitting would have to come to an end until other permitted DER <br />systems became'available and secondly, only dry line permits up <br />to the capacity of the plant being permitted would be considered. <br />Commissioner Scurlock clarified that the risk is that if <br />for some reason the plant was not permitted, we could not issue a <br />Certificate of Occupancy for a development until some alternate <br />wastewater system was made available. He believed the developers <br />are well aware of this situation. <br />Attorney Brandenburg stated that a policy already has been <br />established that in order for the developer to obtain the dry <br />line system, they have to show a capability of providing an <br />alternate site and bond it off. <br />ON MOTION by Commissioner Scurlock, SECONDED <br />by Commissioner Wodtke, the Board unanimously <br />adopted Resolution 85-35 as described above. <br />88 <br />W W W <br />