Laserfiche WebLink
Right-of-way Dedication <br />(6th Ave. frontage) <br />Sidewalk/BikepathI 8 ft. <br />(U.S. #1 and 8th St. frontage) <br />Total <br />$12,500 <br />$144,500 <br />* Improvement programmed by FDOT. This improvement will be <br />constructed and funded by FDOT in the future. However, this <br />project will require these improvements to be installed prior <br />to the FDOT's schedule. Therefore, this project must install <br />these improvements. _. <br />** This access point may be deleted during site plan review. If <br />it is allowed, it must be relocated to the north. <br />*** Represents 1/3 of the cost of paving 8th Place (petition <br />paving formula). Amount must be escrowed with the County for <br />use when a paving petition is approved. <br />**** Represents fair share contribution for light at 8th St. and <br />6th Ave. Money shall be escrowed with the County for use <br />when light is installed at this location. <br />TABLE 2 <br />County Provided Improvements Directly Benefitting <br />Subject Property <br />Improvement <br />Right-of-way <br />Acquisition <br />Road Construction <br />Total <br />Description <br />50 ft. of right-of-way <br />(833 ft. along the 8th <br />Street corridor from 6th <br />Avenue to U.S. #1) <br />Construction of 8th St. frau <br />6th Avenue to U.S. #1 <br />(3 lane roadway) <br />55 <br />Approximate <br />Cost <br />$85,000 <br />(Paid to owners of <br />the subject property) <br />$120,000 <br />$205,000 <br />MAY 1 1985 BOOK uO Pmcf. 7 91 <br />