Laserfiche WebLink
3.2 Emergency Dune Nourishment- Wabasso and Golden Sands <br />Indian River County awarded a construction contract to the lowest qualified bidder for Emergency dune <br />stabilization for the Wabasso and Golden Sand PROJECT to repair damages sustained during Hurricane Sandy. <br />Eligible Costs include mobilization, demobilization, beach fill, permit compliance monitoring, nest relocation, <br />beach tilling, and native beach -dune vegetation. <br />Deliverable A: Copy of All Periodic Certified Pay Invoices as submitted by Contractor and approved by County <br />for the Wabasso repair. <br />Total Cost: $32,865 ($16,432.50 — DEPARTMENT funds). <br />Due Date: January 30, 2017. Task is 100% complete. <br />Deliverable B: Copy of All Periodic Certified Pay Invoices as submitted by Contractor and approved by County <br />for the Golden Sands repair. <br />Total Cost: $42,286 ($21,143 — DEPARTMENT funds). <br />Due Date: January 30, 2017. Task is 100% complete. <br />3.3 Hurricane Repair Construction <br />Indian River County will proceed with a storm repair PROJECT to replace sand lost during the passage of <br />Hurricane Sandy. The PROJECT will place 154,700 cubic yards landward of the mean high water line. Sand will <br />be truck hauled from an upland sand mine approved in the Joint Coastal Permit 0285993. Authorization for the <br />storm repair is provided in 0285993 -008 -JN for one-time only placement. <br />Deliverable A: Pay surveys for completed winter 2014/2015 Indian River County Hurricane Repair PROJECT <br />construction event. <br />Total Cost: $3,392,263.03. <br />Total Eligible for State Cost Share: $3,237,774 (DEPARTMENT Cost: $1,618,887.00). <br />Due Date: January 31, 2018. <br />Deliverable B: Final Project Report and Certification for the 2014/2015 Indian River County Hurricane Repair <br />PROJECT construction event. (CBI WO No. 7). <br />Total Cost: $57,319 (DEPARTMENT Cost $28,659.50). <br />Due Date: January 31, 2018. <br />Deliverable C: Construction period sea turtle monitoring report including pre- and post -construction lighting <br />survey findings, disorientation summary, late season monitoring, total nests observed, total nests relocated, nesting <br />success and hatching success. The work period extended from October 2014 through February 2015. <br />(EAI WO No. 5). <br />Total Cost: $21,376 (DEPARTMENT Cost: $10,688). <br />Due Date: January 31, 2018. <br />Deliverable D: Construction phase, March 2015, sea turtle monitoring nighttime log for the Sector 3 Dune Repair <br />PROJECT as required by DEPARTMENT Joint Coastal Permit 0285993, modification 0285993 -008 -JN for one- <br />time only sand placement. (EAI WO No. 9). <br />Total Cost: $3,725 (DEPARTMENT Cost: $1,862.50). <br />Due Date: January 31, 2018. <br />Deliverable E: Construction phase, March 2015, sea turtle monitoring data in Florida Fish and Wildlife <br />Conservation Commission (FFWCC) format. (EAI WO No. 6). This was additional work required due to <br />leatherback nesting during construction. <br />Total Cost: $13,057.50 (DEPARTMENT Cost: $6,528.75). <br />Due Date: January 31, 2018. <br />DEP Agreement No. 14IR2, Amendment No. 2, Attachment A, Page 4 of 6 <br />