My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/22/1986 (2)
CBCC
>
Meetings
>
1980's
>
1986
>
1/22/1986 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:00 AM
Creation date
6/12/2015 11:27:08 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
01/22/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M M r <br />formal request has been made by any person who proposes to <br />initiate land development interpreted as not expressly included <br />in the fee schedule in Section V.B.(1). <br />(3) In completing the Fair Share Fee <br />Determination, the County Administrator shall: <br />a. Determine the traffic demand the proposed <br />land development activity places on the <br />County's major road network. In determining <br />the traffic demand on the proposed land <br />development activity, the County Administrator <br />shall consider the information outlined in <br />Section V.C. (2) (a) -(c) . <br />b. Assess the capital expansion of the <br />County's major road network system that will <br />be necessitated by the proposed land <br />development activity. Standard acceptable <br />practices and methodological procedures in the <br />transportation planning and engineering <br />profession shall be used to determine the <br />capital expansion of the County's major road <br />network system necessitated by the proposed <br />land development activity. <br />C. Determine the costs for providing the <br />capital roadway expansion necessitated by the <br />proposed land development activity. The cost <br />figures used in assessing the costs for <br />providing the capital expansion necessitated <br />by the proposed land development activity <br />shall be based upon recent empirical <br />information of the costs in Indian River <br />County for the construction of a lane mile, <br />and shall include related right-of-way costs, <br />traffic control equipment costs and the <br />planning, design, and engineering costs and <br />other related capital costs for the necessary <br />- 16 - <br />sooK 63 P,,GE 445 <br />
The URL can be used to link to this page
Your browser does not support the video tag.