My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-037
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 1:25:21 PM
Creation date
3/16/2016 11:56:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/15/2016
Control Number
2016-037
Agenda Item Number
8.B.
Entity Name
Dunkelberger Engineering and Testing
Subject
Work Order #2 Old Dixie Highway Resurfacing
First Extension to Agreement
Area
Old Dixie from 71st St. to CR 510
Project Number
1138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Materials Testing Services Page 3 <br /> Old Dixie Highway Resurfacing ■ Indian River County, Florida <br /> March 2, 2016 ■ Terracon Proposal No. PHB161007 <br /> Contractor QC Testing of Asphaltic Concrete (AC) Pavement <br /> We understand that the Contractor is responsible for their own QC testing which shall <br /> include performing at least one set of asphalt laboratory tests per day to evaluate the <br /> materials and construction during paving. A minimum of three cores shall be cut by the <br /> Contractor on daily basis to evaluate the in-place (constructed) density of the structural <br /> course construction. The cores will be tested for bulk specific gravity, and the <br /> compaction will be evaluated based on the percentage of the bulk specific gravity over <br /> the maximum density determined in the plant on the bulk mix materials. As an option, <br /> the density (% compaction) of the wearing course construction may be evaluated using <br /> a calibrated nuclear gauge if a correction factor can be established using the core <br /> densities from the first day of wearing course paving <br /> Terracon will not be in the asphalt plant to perform any verification testing during asphalt <br /> production. <br /> Engineering & Reporting <br /> • Engineering oversight and review during the construction to coordinate the <br /> aforementioned test program, make site visits, and attend progress meetings. <br /> • Submittal of brief engineering reports documenting our findings and test results. <br /> Our materials testing services will be provided on an as-needed basis as dictated by the <br /> pace and methods of construction. <br /> C. COMPENSATION <br /> The material testing services provided will be billed in accordance with our current <br /> 2014-2016 Continuing Geotechnical Services Agreement the line item unit rates <br /> illustrated on the Projected Scope and Budget (Attachment A). As stated earlier a four <br /> test minimum charge per trip to the site will apply. Terracon proposes to complete the <br /> scope of services as described herein for an estimated fee of $37,860 and <br /> invoiced on a unit rate basis. If additional services outside the listed project services <br /> are required, Terracon will provide such under auspice of a Supplemental Proposal <br /> using the same line item unit rates as provided herein. <br /> The quantity of the work performed and factors beyond our control, such as weather <br /> and the contractor's schedule/efficiency, will affect the actual cost for our services. You <br /> will be invoiced at regular intervals but not less than monthly for services performed. <br /> lrerracon <br />
The URL can be used to link to this page
Your browser does not support the video tag.