r <br />JUL 3, 198 . BOOK 65 ou-2 .Q <br />General Contractor's overhead, such as scaffolding, miscellaneous <br />labor, etc. Mr. Block emphasized that last December he did give <br />the County a $2.5 million figure for this building and that <br />figure has decreased because in the working drawings, they used a• <br />bare bone approach to the costs. They have added some things <br />like furniture for the auditorium, impact fees, seeding, <br />flagpole, etc. <br />x <br />Chairman Scurlock felt he was willing to assume some risks <br />in not providing a covered area for confiscated goods, because <br />cutting back $10,000 here and there on the main building would <br />not amount to any substantial savings. He preferred-to cut out <br />the $323,098 for the storage building. <br />Mr. Block agreed that by bidding the ancillary buildings as <br />alternates,'it will give us some flexibility until we can get the <br />actual costs. <br />Commissioner Lyons was inclined-to agree with Chairman <br />Scurlock that we could get along without the storage facility, <br />and Mr. Block pointed out that the Board could always consider <br />cutting down the size of the storage building, because there are <br />some evidence rooms provided in the main building. <br />a <br />Sheriff Tim Dobeck explained that the storage facility for <br />confiscated vehicles and articles would be located between the <br />Sheriff's Administration Building and the Jail, and suggested <br />that two bays in the shop area would be sufficient for now. <br />Commissioner Wodtke still favored bidding the entire project <br />to find out the total cost of the project, as well as bidding out <br />the ancillary buildings as alternates, and the Board indicated <br />their agreement with that suggestion. <br />Chairman Scurlock advised that Public Works Director Jim <br />Davis is requesting authorization to go ahead and extend the <br />existing contract with Ted Meyers Contracting Co. for <br />construction of a gravity sewer line to the Jail site to cover <br />the new Sheriff's Administration Building also. If the Board <br />approves the-change order for $6,931.50, this job can be done <br />77 <br />