My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/23/1986
CBCC
>
Meetings
>
1980's
>
1986
>
7/23/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:03 AM
Creation date
6/12/2015 12:44:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/23/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />while the contractor is out in the field and has everything torn <br />up. <br />ON MOTION by Commissioner Lyons, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />Change Order #1 to the contract with Ted Myers <br />Contracting Co. in the amount of $6,931.50 to cover` <br />the costs of extending the gravity sewer line to <br />the new Sheriff's Administration Building. <br />Indian River -County Fitgu)eering Dept. <br />1840 — 25th Street <br />CHANGE +•I .t...r..... • . Vero Beach, FL <br />Approved as to firm <br />ORDERand legal sufficiency <br />\kl Iltllr ; <br />AIA UUr (MUNI C701 t r+:< j• , By <br />Y <br />t e I I II IS* Bruce Barkett <br />PROIECT i <br />(name. rddn v.t <br />I)Ait July 23, 1986 <br />r9 <br />TO IConrractor): <br />r� Engineer's I'Kt )II c I �:+ ► 8236 <br />` Ted Myers Contracting Co. (,),;(KAt'Ir+t; Gravity Seger Line (Jail Site) <br />P.O. Box 229 New Sheriff's Office <br />Winter Beach, FL 32971 <br />L•� (')N(I;•v I I+a(1 July 1986 <br />You are directed to make The fullim-in) r I:r,, r•. is Pev ( •r+•,.It I <br />Bid Item No. 1 <br />Furnish & Install complete <br />in place 8' PVC pipe. 295 L.F. $17.70/L.F. $5,221.50 <br />Bid Item No. 2 <br />Furnish & install complete <br />in place 6" PVC pipe. 40 L.F. $ 8.00/L.F. 320.00 <br />Bid Item No. 3 <br />Furnish & install manholes <br />(Type A). 1 each $980.00/ea. 980.00 <br />Bid Itett No. 5 Ill <br />Furnish & install 6" PVC <br />threaded plugs. 2 each $ 30.00/ea. 60.00 <br />Bid Item No. 7 <br />Drill (Core Tap) into <br />existing manhole 1 each L.S. 300.00 <br />Bid Item No. 8 <br />Furnish & install one single <br />"y"(Wye)-4" 1 each $ 50.00/ea. 50.00 <br />$6,931.50 <br />Nut %al.d unhi signed by nom the own,•r and Are ii,I <br />Signature ell the (.untfarnrr endirates his a):re—em he i -oh uufl ,ihn•; .,n, .,d;:1't.... ... 1 ..ra'al I t...... <br />The original (Contract Sum) (Guaranteed Maxnnunt ( m•:1 %%.e. S 14,609.52 <br />Net Ihange try prev"nryly authormed Chan;••• ( )t.fe•• $ <br />The IrunteatI Surn) (Guaranteed Maxnnum t_u•1, pasta b. the. 1 h,:nv rr. !vr a..,. S 14,609.52 <br />The (Contract Sunil (Utivanteed Maxununt t.e.,U wdl he nm m.,." d, air. „ , r.i• ria., i.,,ni;cel: S 6,931.50 <br />by this Oiange Order .... . <br />The new (Contract Sum) (Guaranteed Maarnlum t ,. 'r nit lud.ni; ihr. a I-xige ( ),der ::rn 1•c S 21,541.02 <br />The Contract Time will he nncreased) (etre r.• r.erl• 4ua L ee.retl? Irt ( ) nays <br />The Date lit Sub%wimil Cnmp(c•trun as of +6e tf.,••• •I: :! r !.an.,• r r..h•r Ih.•n ;••rr , 60 days <br />.uhe+r•. a t1 <br />James W. Davis P_E.Ted Myers _ Indian River County__ <br />ENGINEER 1840 25th St Cert_ P.O. Box 229, 18.10 25th Street' <br />Vero Beach, Fl. 32960 Winter Bich, FL 32971 Vero Beach. FL 32960 <br />By By By <br />Date 8�5—Y- Date cT~% "9E,, Date Z oz3 <br />78 <br />Boa bb ibuc �i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.