1 Completion of all punch list items recorded from the substantial completion inspection. <br />2 A complete set of mylar or paper marked -up as-builts with "RECORD" or "AS BUILT" clearly <br />printed on each sheet along with one copy on AutoCAD CD Release 14 or better on State Plane Coordinates. <br />Contractor shall accurately and neatly transfer all deviations from progress as-builts to final as-builts. As -built <br />records shall include drawings signed and sealed by a registered land surveyor certifying the elevation and <br />location of improvements Certified drawings are to show locations, lines and grade of buried pipe line four (4) <br />inches or larger in diameter and exterior to buildings, and other buried facilities (e.g. valves, tanks, vaults, <br />storm inlets, ducts, etc.) installed or discovered as a result of the work. Certified drawings are to show building <br />corners, sidewalks, paved areas and the location of all above ground structures within the project site <br />Contractor shall sign each final record drawing and note thereon that the final as-builts are complete and <br />accurate <br />3 A complete set of marked -up specifications with "RECORD" or "AS -BUILT" clearly printed on <br />the cover Contractor shall accurately and neatly transfer all deviations from progress specifications to final <br />as-builts. <br />4 A signed and notarized affidavit indicating that no asbestos containing materials were used or <br />installed during the course of the work. <br />5. A list of each piece of equipment having an individual value of $500 or greater The list shall <br />include, at a minimum, the name, make and model number, quantity installed, value of equipment. <br />Contractor shall inform Owner in writing that work is ready for final inspection The Engineer will, <br />within five (5) business days, make such inspection. When Engineer finds the work acceptable under the <br />Contract and all contract terms and conditions fully performed, Engineer shall issue a Final Certification to <br />Owner. <br />GC 42 EXTENSION OF TIME <br />The time limit for the completion of the work as described in the Contract is of the essence of this <br />Contract. Contractor must request an extension of the contract completion date in writing and must provide <br />the following information within seven (7) days of commencement of the delay Contractor acknowledges that <br />the evaluation of time extensions will be based on the following information <br />1. All schedule updates, submittals and other conditions of the Contract have been met; <br />2. The delay is beyond the control of the Contractor and subcontractors and due to no <br />direct or indirect fault of the Contractor <br />3 Nature of the delay <br />4. Dates of commencement / and end of delay <br />5 Evidence that the delayed work results in a direct delay to the schedule critical path <br />6 List of tasks/work affected by the delay <br />7. Anticipated extent of delay. <br />8. Recommended action to minimize delay. <br />9. The Contractor has used all the float time available for the work involved in the delay <br />request. <br />Time extensions for weather delays will only be considered if all float time is exhausted prior to the weather <br />occurrence Failure of Contractor to timely request a time extension constitutes a waiver by Contractor and a <br />denial of a time extension <br />If the Contractor is delayed at any time in the progress of the work by any act or neglect of the Owner, or if any <br />employee of the Owner or by any separate Contractor employed by the Owner or by any changes ordered in <br />the work, by labor disputes, fire, or unusual delay in transportation, unavoidable casualties or any causes <br />beyond the Contractor's control or by delay authorized by the Owner pending resolution of disputes, and such <br />delay extends the Project completion date, Substantial Completion shall be extended by Change Order for <br />such reasonable time as the Owner may determine. <br />GC 43 NO DAMAGES FOR DELAY; EXCLUSIVE REMEDY <br />The Contractor expressly agrees that a change order for an extension of the project completion date <br />and substantial completion date constitutes its sole and exclusive remedies for efficiency or other related time <br />or impact -based claims (hereinafter collectively "delay") or for delay attributable to any foreseen or unforeseen <br />condition, or for delays claimed to be the result of active, intentional, knowing or passive interference by the <br />39 <br />