My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/13/1986 (2)
CBCC
>
Meetings
>
1980's
>
1986
>
8/13/1986 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:03 AM
Creation date
6/12/2015 12:49:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/13/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED ESTIMATED <br />PROJECT CONSTRUCTION COST ENGINEERING COST <br />Raise RO plant elevated storage <br />tank $150,000.00 <br />Membrane fouling test $3,000.00 <br />Ultra low pressure membranes <br />.demonstration test $17,500.00 <br />Engineering for above projects $92,444.00 <br />Engineering costs were not split out since project tasks overlap <br />Telemetric Control System <br />Fluoridation System <br />Electrical Improvements/ <br />Lightning protection system <br />Total Estimated Costs <br />$26,000.00 $9,920.00 <br />FUNDED BY STATE GRANT <br />$44,000.00 <br />$1,187.500.00 <br />$1,760.00 <br />$109,124.00 <br />The capital improvement projects will be funded through the existing <br />impact fee fund which will be replenished by new customers served as <br />the system expands. <br />RECOMMENDATION: <br />The Utilities Division recommends that the Board of County <br />Comissioners approve the capital expansion and improvements projects <br />with preliminary cost estimates totalling $1,187,500.00 and authorize <br />DSS Engineers to provide engineering services for the projects at a <br />cost of $109,124.00. Funding is part of FY 86-87 budget with <br />transfers from the Utilities impact fee fund. <br />Commissioner Wodtke questioned the 8-1/2o fee structure for <br />e <br />the engineering services, and Director Pinto felt that the fee <br />structure was fair for the amount of work that has to be done. <br />Commissioner Bird repeated that he relies very heavily on <br />the staff to scrutinize these negotiated professional engineering <br />fees, and Director Pinto noted that many times they even change <br />the scope of work to do away with some duplication and then <br />renegotiate the price. <br />ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Bowman, the Board unanimously <br />(4-0, Commissioner Lyons having temporarily left <br />the meeting) authorized the engineering to proceed at a <br />cost of $109,124 in FY 86-87, based on recommendation <br />of staff. <br />(WORK AUTHORIZATIONS FOR THE ABOVE ON FILE IN CLERV S <br />OFFICE) <br />47 <br />�IA� BOCK 65 FAE 409 <br />
The URL can be used to link to this page
Your browser does not support the video tag.