My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/3/1987
CBCC
>
Meetings
>
1980's
>
1987
>
3/3/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:45:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/03/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO The Honorable members of the DATE: February 24, 1987 FILE: <br />Board of County Ccmnssioners <br />THROUGH: <br />Charles P. Balczun, <br />County Administrator <br />SUBJECT: <br />Proposal From City of Vero <br />Beach's Consultant, Lloyd and <br />Associates, to Jointly <br />Construct a Bridge and Utility <br />Structure Over the Main Canal <br />at Country Club Drive <br />FROM: James W. Davis, P.E., REFERENCES: Darrell E. <br />McQueen, Lloyd <br />Public works Director and Assoc. to Jim Davis <br />DESCRIPTION AMID CONDITIONS <br />In the effort to reduce capital expenditures, the Public Works staff <br />recently proposed repairing the Country Club Drive bridge in lieu of <br />constructing a new concrete bridge. Most of the $150,000 that was budgeted <br />in .the FY 86/87 Road and Bridge Division budget could be saved, however, in <br />the Main Canal environment, a timber substructure bridge will probably <br />deteriorate within 10-15 years. Last summer, the Board authorized <br />Kimley-Horn & Assoc. to assist the Engineering Division in designing a. <br />concrete bridge. As engineering progressed, it was determined that the <br />design would result in at least a $150,000 expenditure for a new bridge. <br />Due to budget restraints, the consultant was asked to cease work and the <br />Road and Bridge Division was planning to replace wood piling this summer. <br />The City of Vero Beach has three utility lines supported by the existing <br />bridge and must relocate them. The City's consultant has proposed that <br />Indian River County and the City of Vero Beach jointly fund a concrete <br />bridge with utility raceways. The cost would be: <br />Indian River County share $ 95,000 <br />City of Vero Beach share 15,000 <br />Total cost including Engineering $110,000 <br />If this proposal were accepted, the County would still save $55,000 from <br />our budgeted figure of $150,000. <br />RECOMMENDATIONS AND FUNDING <br />It is recommended that the County accept this proposal and jointly fund <br />this project with the City. Funding to be from Fund 111-214-541-, Road and <br />Bridge Division. <br />Commissioner Eggert inquired how the cost got from $150,000 <br />to $110,000, and Director Davis explained that it is basically <br />due to the availability of a contractor who is building a bridge <br />going over to the John's Island area. He is about finishing up <br />on that bridge, and Lloyd & Associates have indicated he would be <br />willing to do the work for this price. <br />Engineer Darrell McQueen of Lloyd & Associates, engineers <br />for the City of Vero Beach, agreed it is an unusual price, <br />probably slightly more than half of what it would be if you went <br />63 BOOK q r P <br />MAR 3 1987 . � V: <br />
The URL can be used to link to this page
Your browser does not support the video tag.