Laserfiche WebLink
ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously approved <br />Change Order IRC 3-5 - Sheriff's Administration <br />Building (PWR Corporation). <br />%(.%'n1ANGE <br />ORDER <br />AIA DOCUMENT 0701 <br />Distribution to: <br />sloped glazing -*substitution . <br />OWNER <br />❑ <br />ARCHITECT <br />❑ <br />CONTRACTOR <br />❑ <br />FIELD <br />❑ <br />OTHER <br />❑ <br />PROJECT: Sheriff's Administration Building CHANGE ORDER NUMBER: I.R.C. 3-5 <br />(name, address) <br />INITIATION DATE: April 10, 1987 <br />TO (Contractor): <br />ARCHITECT'S PROJECT N0: 8528 <br />1—PWR Corporation <br />P.O. Box 249 CONTRACT FOR: 4n- story block office -- <br />Highland City, Florida 33846 Building <br />L J CONTRACT DATE: Qetohet 1.3, 1986 <br />You are directed to make the following changes in this Contract: <br />1. <br />sloped glazing -*substitution . <br />Delete: <br />($3,049.0.0) <br />2. <br />Trench drain main substitution <br />Delete: <br />($1,865.00) <br />3. <br />Chem -Surf counter top substitution <br />Add: <br />$297.00 <br />4. <br />Add Junction Box to N.W. entrance drive- <br />Add: <br />$231.00 <br />5. <br />Convert existing flow well for irrigation <br />Add; <br />$314.00 <br />6. <br />Substitute LCN Closets <br />Delete: <br />( .$220.16) <br />7. <br />Sheriff's Staff hardware changes <br />Add: <br />$85.15 <br />8. <br />Reshape north swale per County drawing' <br />Add: <br />$607.74 <br />9. <br />Aluminum fascia substitution <br />Delete: <br />($4,000.00) <br />10. <br />Transmission fluid reels (3) and Cl) headlight aimer <br />Addt <br />$3,393.00 <br />11. <br />Stucco band addition <br />Add: <br />$1,688.17 <br />12. <br />Additional Sheriff's Administration hardware changes <br />Add; <br />$170.00 <br />13. <br />Delete 8-30 cabinet in dark room <br />Del te:$140.00 <br />TOTAL DEDUCT: <br />$2,488.10 <br />Not valid until signed,by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) X0X*XXtUXXXMXo16X&U was ........................... $ 2,106 55.- C <br />Net change by previously authorized Change Orders ................................... $ 412., 054 4' <br />The (Contract Stem)X§XXrXK0X0 tNKi6X(X*)Q prior to this Change Order was........... $' 2-; 518, 209,4 <br />The (Contract Sum) A XMNW i gh will be (decreased)X(� r <br />by this Change Order.......................................................... <br />$ 2, 488:? <br />The new (Contract Sum) (�3X�'cr'riiX ncludin this Change will be ... $ 2,515,72 1.: <br />The Contract Time will be R%%X*XgXW) @X (unchanged) by ( 0 ) Days. <br />The Date of Vgx!'Completion as of the date of this Change Order therefore is <br />C. E. B1ock.Architect, Inc. <br />ARCHrTECr 1995 -39th Avenue <br />Address Vero Beach, Florida <br />11Y <br />S/00, <br />JUN 2197 <br />PWR Corporation <br />coNT "' P , O . Box 249. <br />AddressHighllnd Ci•t <br />y, Fl ori.da <br />By <br />DATE <br />7 <br />September 21, 1987 <br />Authorized: <br />Chairman of I.R.C. Commissio <br />OWNER <br />.G <br />Address <br />By <br />DATE Ira /y 7 <br />BOOK <br />