My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/25/1987
CBCC
>
Meetings
>
1980's
>
1987
>
8/25/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:52:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/25/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG5 198769 FACE <br />6. Landscaping and Buffering: <br />North: 25' perimeter setback/preserve with existing <br />dense vegetation (understory and canopy); <br />Transitional lots: 60' x 120'. <br />South: Adjacent to vegetated 50' wide D.O.T. drainage <br />ditch, 25' perimeter setback/preserve with <br />existing vegetation (understory & canopy). <br />West: Adjacent to U.S. #1 40' landscaped buffer with <br />varied 6' privacy wall. <br />East: 25' perimeter setback/preserve with existing <br />vegetation (understory & canopy); Transitional <br />lots: 100' x 110' adjacent to Vero Shores, <br />open space recreation area, and 60' x 120' <br />lots for remaining portion. <br />7. Open Space Required: 24.8 acres; 42.5% <br />Provided: 40 acres; 69% <br />8. Recreational Space Required: 2.9 acres; 5% <br />Provided: 14.14 acres; 250 <br />(includes pedestrian paths, passive recreation 'areas, recre- <br />ation center, pools, tennis courts, nature park) <br />9. Utilities: The project is to be served by public water and <br />wastewater utilities. <br />10. Drainage: The conceptual drainage plan has been approved by <br />the Public Works department. Use of wet stormwater areas and <br />corresponding littoral zones will be more specifically' <br />addressed during preliminary PRD plan review. <br />11. Traffic, Circulation: The Traffic Engineer has approved the <br />conceptual traffic layout. Access is to be exclusively from, <br />U.S. #1, with emergency access provided to 5th Avenue, S.E. <br />Because 5th Avenue S. E. is a half street, created -"via the <br />Vero. Shores •plat; the : proposed -"Garden. Grove PRD plat will <br />•7 include a right-of-way dedication for 5th -Avenue S.E: to make <br />it; a -full --street An: agreement :<with.I.the1,Public Works depart- <br />- ment,�-needs moo: be -executed`: -whereby; an, arrangement is made for . <br />#pro,4ment' bEi the dxi:stiiig! h&lfTstareet�s:alons the---:site's,._o <br />:frontage- (±450') i:.,. ,...`` <br />12. Phasing: A total of -five phases is proposed with the first <br />phase including a park area with many of the proposed re- <br />creation amenities. Each phase is to be designed to "stand <br />alone" in regards to providing required improvements and <br />meeting County standards. <br />13. Waivers: The following waivers are requested: <br />Interior Perimeter Normal <br />Lots (smallest) Lots* RS -6 Lots <br />Lot Size 4,500 s/f min. (7,200 s/f min.) 7,000 s/f min. <br />Lot Width 50' min. 60' min. 70' min. <br />Sideyard 5' min. 5' min. 10' min. <br />Rearyard 10' min. 20' min. 20' min. <br />*excludes lots adjacent to Vero Shores. <br />Other Waivers: <br />1. The road right-of-way for the non -boulevard internal streets <br />is to be 401. <br />19a <br />
The URL can be used to link to this page
Your browser does not support the video tag.