My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/16/1988
CBCC
>
Meetings
>
1980's
>
1988
>
2/16/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:32:17 AM
Creation date
6/12/2015 2:06:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/16/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />Commissioner Carolyn Eggert <br />THROUGH: <br />Charles P. Balczun, <br />County Administrator <br />FROM:James W. Davis, P.E <br />Public Works Director <br />DATE: <br />February 9, 1988 <br />FILE: <br />SUBJECT: °rt of Road and <br />Infrastructure Improvements <br />Required - Proposed Main <br />Library Sites <br />This date, the Public Works Department inspected four proposed main library <br />sites. Our comments follow: <br />Site 1 Catron Site (South of SR60 between 25th Ave and 23rd Ave) <br />19th Street along South of site <br />present width 19' <br />no sidewalks existing <br />- since the parcel being considered does not contain 19th Street <br />frontage, no improvements are anticipated. If widening to 22' is <br />required, a cost of $2,500 would result <br />sewer/water in area <br />23rd Avenue along east of site <br />present width is 20' <br />driveway should be connected to 25th Ave <br />to widen to 22', cost of $10,000 would apply due to curb <br />SR60 left turn lane extension would cost $10,000 <br />25th Avenue along west side of site <br />present width is 19'3". To widen this road to 22', a cost of <br />$10,000 would apply. <br />there is good open frontage on 25th Avenue for a proper site <br />connection. <br />Extension of the westbound SR60 left turn lane may be required at <br />a cost of $15,000. <br />sidewalks are required at a cost of $7.50/lf or approx. $4,000. <br />- DOT drainage outfall available. <br />Impact Fee Zone 5 <br />Site 2 North side of SR60 west of 28th Avenue <br />28th Avenue is 22' wide existing paved road - No widening is <br />required. <br />- sewer/water in area <br />- no eastbound left turn lane exists along SR60. This installation <br />is estimated to cost $25,000. <br />DOT drainage outfall available <br />Site 3 Old Jail Site - 1700 17th Avenue <br />17th Avenue pavement is 24' wide, no improvements required. <br />sidewalk is existing on east side of 17th Avenue providing good <br />pedestrian access. <br />SR60 Twin Pairs Project is programmed to north of site <br />water/sewer in area <br />drainage outfall available <br />Site 4 <br />FEB 161988 <br />New Health Dept. Building Site - North of 27th Street at 19th <br />Avenue <br />27th Street width is 24'6". No improvements needed. <br />trapezoidal shape of property would result in difficult site <br />planning. <br />road access is poor due to FDC railroad crossing to east, airport <br />to north, and no collector or arterial road access. <br />83 <br />a00K 70 PAGE 901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.