Laserfiche WebLink
FEB 2 <br />Utilities Director Terry Pinto explained that using the new <br />selection process, CDM came out on top for this particular <br />category. <br />Service <br />Design <br />Special Services <br />Services During Bidding <br />Services During Construction <br />Resident Inspection Services <br />Start -Up Services <br />TOTAL <br />CAMP DRESSER & McKEE INC. <br />Cost <br />$285,800.00 <br />38,859.00 <br />24,542.00 <br />112,450.00 <br />255,488.00 <br />80,975.00 <br />$798,114.00 <br />Chairman Scurlock pointed out that the CDM proposal shows <br />the total of $798,114.00 for the first phase, the design phase. <br />However, the price for this particular design is $285,800, which <br />is what we are approving today. Some of those services we may <br />choose to do with CDM and some we may choose to do inhouse. He <br />explained that what we have tried to do, at least in the area of <br />utilities, is to model our fee curve after that of FmHA, which is <br />the lower end of many of the fee curves that are proposed. A lot <br />of it can get tricky as to what is included in that particular <br />fee, but we try to negotiate additional services that are not <br />usually included under the normal situation. Chairman Scurlock <br />wanted everyone to be aware of that, because we are spending <br />substantial dollars in this county to get these things designed, <br />and we have to watch very closely the product we are getting and <br />what we are paying for it. <br />1988 <br />94 <br />BOOK 71 PAGE 94 <br />