My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/31/1988
CBCC
>
Meetings
>
1980's
>
1988
>
5/31/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:10 PM
Creation date
6/12/2015 2:18:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/31/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
would like to recommend that we proceed with the project and go <br />through the assessment simultaneously. Director Pinto advised <br />that he would address change orders to this contract in the next <br />item. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously (4-0) awarded <br />the contract for the Rockridge Sanitary Sewer System <br />to the low bidder, Roese Construction Company in the <br />amount of $2,411.780.25, contingent upon approval by <br />the Environmental Protection Agency and authorized <br />proceeding with the assessment simultaneously. <br />ROCKRIDGE SEWER SYSTEM CONTRACT - CHANGE ORDERS #1 AND #2 <br />Utilities Director Pinto reviewed the following: <br />TO: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />THRU: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />WILLIAM F. McCAIN I. IM MCC <br />/ <br />PROJECTS ENGINEER( <br />DEPARTMENT OF UTILITY SERVICES <br />DATE: MAY 26, 1988 <br />SUBJECT: CHANGE ORDERS #1 AND #2 <br />ROCKRIDGE SANITARY SEWER SYSTEM CONTRACT <br />INDIAN RIVER COUNTY PROJECT NUMBER US -87 -21 -AR <br />BACKGROUND <br />48 <br />WAW , <br />Two change orders (both of which are attached) are being submitted for <br />approval to reduce the contract price for the above stated project. <br />The change orders are as follows: <br />1) Change Order #1 - various items within the system and within <br />the scope of work have been modified or eliminated. (See <br />Attachment (A) of Change Order #1.) This change order also <br />extends the contract time from 270 days to 360 days. The <br />cost savings realized by this time extension is also shown on <br />Attachment (A) previously referenced. <br />2) Change Order #2 - This change order authorizes the County to <br />purchase the 413 grinder pumps units directly from the <br />manufacturer to be used in this contract. It also <br />authorizes direct purchase of the 40 spare pumps and the <br />2 emergency generators. <br />76 <br />L_ <br />SAY 311988 Boow 72 P,�GF481 <br />
The URL can be used to link to this page
Your browser does not support the video tag.