Laserfiche WebLink
be in this area and therefore additional costs will be kept down <br />by utilizing the equipment and labor force already preparing 37th <br />Avenue. Also paving of 13th Street will eliminate the grading of <br />the short section of unpaved roadway. <br />Funding in the amount of $3,672.37 would come from the Road <br />and Bridge Accounts #111-214-541-035.39 and 111-214-541-035.31. <br />Commissioner Eggert asked if there was some resistance to <br />the proposed paving, and Public Works Director Davis did not know <br />of any resistance to connecting 13th Street up by any property <br />owners. This is a situation of a very short section of roadway <br />that would be left unpaved. Staff in the past has not <br />encouraged the County paying 100% of the cost, but it is very <br />impractical to leave some very short sections unpaved when you <br />are doing the roads in an area. He believed we will have the <br />same situation in the Gifford sewer project that is coming up. <br />Commissioner Wheeler wished to know if we can't look at <br />these in advance and bring them onto the assessment roll when we <br />do a street, and Director Davis agreed that we should start doing <br />that. <br />ON MOTION by Commissioner -Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously authorized <br />the paving of 13th Street between 36 and 37th <br />Avenues as recommended by staff. <br />AGREEMENT W/I.R.SHORES TO PURCHASE AMBULANCE FOR USE BY FELLSMERE <br />VOLUNTEER AMBULANCE SERVICE <br />Administrator Balczun reviewed memo from the Director of <br />Emergency Management: <br />34 BOOK 73 F-mUE 385 <br />