My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/20/1988
CBCC
>
Meetings
>
1980's
>
1988
>
9/20/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:11 PM
Creation date
6/12/2015 2:26:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY ITEM - WAIVE BIDS & NEGOTIATE FOR REVERSE OSMOSIS <br />MEMBRANES <br />Acting Administrator Collins informed the Board that he had <br />just been handed the following memo in regard to obtaining <br />membranes for the Reverse Osmosis Plant, and it is desired to <br />waive bidding :because of the time factor. <br />TO: William G. Collins II DATE: September 16, 1988 FILE: <br />Acting County Administrator <br />THRU: Terry Pinto, P.- P <br />E�✓� <br />Utilities Director <br />SUBJECT: WAIVE BIDS & NECMMZi'N'. <br />FDR REVERSE OSMOSIS <br />N�'IDRANES-OODTSENT AGE�IDA <br />FR) Am,1t, C.P.M. REFERENCES: <br />Purchasing Manager <br />1. DESCRIPTION Am rnmTTIONS: <br />Brad O'Keefe our Chief Operator, Indian River Water Plant, <br />has requested that we waive bidding on Reverse Osmosis <br />Membranes. These membranes will cost the County approximately <br />$36,000.00. His justification is that time is of the essence <br />in this purchase in order to prevent damage to existing mem- <br />branes. (memo attached)_ - <br />A formal bid will take 4 to 6 weeks to administer plus 2 to <br />3 weeks for delivery after that. <br />2. ALTERNATIVES AMID ANALYSIS: <br />Purchasing procedures allow for bids to be waived if an emergency <br />exists (procedures 2b -d) or if in the best judgement of the <br />County Administrator "it would be feasible to negotiate rather <br />then bid." <br />Two options exist: Bid or Waive Bidding. <br />3. FUNDING: <br />Purchasing has received a budget approved requisition. <br />4. RIDATION: <br />Staff recommends that bidding be waived and we be authorized to <br />proceed to purchase. <br />Bill McCain of the Utilities staff confirmed that we have <br />quite a few membranes that are failing, and we need to get new <br />membranes in immediately. <br />22 <br />SEP 2 0 '1988 poor 74 rPlj <br />- E 306 <br />
The URL can be used to link to this page
Your browser does not support the video tag.