My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/11/1988
CBCC
>
Meetings
>
1980's
>
1988
>
10/11/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:20:42 AM
Creation date
6/12/2015 2:28:18 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/11/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stating that the General Contractor is solely responsible for job <br />site safety rather than the engineer and that the engineer may <br />report any observed safety violations. <br />Attorney Vitunac advised that most of the engineering firms <br />agreed with the language as written. Several of them questioned <br />it, and two of those have accepted some revised language which <br />adds a sentence under the SAFETY section that say the General <br />Contractor shall be solely responsible for safety, but the <br />engineer may report any observed safety violations. Those two <br />firms, which are not before the_Board today, have agreed to that <br />type of language. <br />Chairman Scurlock wanted the language changed in all of <br />these master agreements stating that the Contractor is solely <br />responsible for job site safety, and the Engineer may report any <br />observed safety violations at the job site to the Project <br />Engineer and the Contractor's Representative. <br />Commissioner Eggert asked if it made a difference that Lloyd <br />& Associates has been sold, but Director Pinto explained that the <br />new owners will keep the same name. <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />the Professional Civil Engineering Master Agreement <br />with Carter Associates, Inc. for water, wastewater and <br />other related utility applications services under <br />Classification #1 - Surveying Other Than Directly <br />Related to Design Project, with the modification in the <br />safety language stating that the Contractor is solely <br />responsible for site safety. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />APPROVAL OF PROFESSIONAL CIVIL ENGINEERING MASTER AGREEMENT WITH <br />G & E ENGINEERING, INC. - WATER, WASTEWATER AND OTHER RELATED <br />UTILITY APPLICATIONS SERVICES <br />The Board reviewed the following memo dated 9/29/88: <br />OCT 11'0-88 <br />66 <br />L'OOI. 74 WA 511 <br />
The URL can be used to link to this page
Your browser does not support the video tag.